Licensed lead · not independently verified · dcd-dir-001448

STAR Campus Data Center & Cogeneration Plant (The Data Centers, LLC)

source-reported cancelled

The Data Centers, LLC

Newark · New Castle County · Delaware

Capacity not statedSource updated 1 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for STAR Campus Data Center & Cogeneration Plant (The Data Centers, LLC).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
The Data Centers, LLC
Address and locality
Newark · New Castle County · Delaware
Official metro area
Philadelphia-Camden-Wilmington, PA-NJ-DE-MD
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Not stated
Source freshness
1 October 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001448

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
On-site gasProvider label.
On-site generation
279 MW (source-reported)On-site figures often describe backup generators rather than primary supply; read the provider energy note.
Announced jobs
290 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Energy. Proposed 279 MW natural-gas cogeneration (CHP) plant to power the data center on-site. UD's review found this would have been at least twice the size of any other known on-site generation facility at a US data center. Never built.

Community. A UD faculty/administrator review group and Newark-area residents raised sustained concerns on environmental-impact and campus-mission grounds; UD's review concluded the 279 MW plant was unprecedented in scale for a US data center, could not be environmentally assessed absent a comparable precedent, and that TDC had shifted emphasis toward wholesale power sales rather than the university's science/tech mission. UD terminated the lease as a result.

What the source record says

Proposed circa 2013 by The Data Centers, LLC (TDC): up to 900,000 sq ft of data center space plus the 279 MW cogeneration plant noted above, on the University of Delaware's 271-acre STAR Campus (former Chrysler Newark Assembly Plant site). Sources disagree on the headline investment figure — Data Center Knowledge reported 'approximately $1 billion' while Technical.ly reported 'more than $1.8 billion' for the combined data-center-and-power-plant project; both are recorded here rather than resolving to one number, so investmentUsd is left unset. Coordinates are the 'STAR Campus' OSM way centroid (approximate) — the specific parcel within the 271-acre campus where this project would have sited was not stated in any source reviewed, and the project was never built.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2014-07 · source-reported cancelled

    University of Delaware terminated its lease agreement with The Data Centers, LLC (TDC) on 2014-07-10.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID the-data-centers-star-campus-newark-de. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001448

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Newark, DE · New Castle (Approximate location)

Roles

  • Operator: The Data Centers, LLC

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2014-07 · source-reported cancelled

    Status history supplied by the source.

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: On-site gas

    Provider label.

  • On-site generation: 279 MW (source-reported)

    On-site figures often describe backup generators rather than primary supply; read the provider energy note.

Permits, incentives, jobs and proceedings

  • Announced jobs: 290 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-01

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →