Licensed lead · not independently verified · dcd-dir-001420

TA Realty East Tanners Church Road Data Center

source-reported permitted

TA Realty

Ellenwood · Clayton County · Georgia

Reported planned 180 MWSource updated 10 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for TA Realty East Tanners Church Road Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
TA Realty
Address and locality
Ellenwood · Clayton County · Georgia
Official metro area
Atlanta-Sandy Springs-Roswell, GA
Source-reported status
permitted
Provider facility type
data center
Reported capacity
Planned: 180 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
10 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001420

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Announced investment
$959 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
30 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Development Authority of Clayton County property-tax abatement (10-year phase-in) · Clayton County, Georgia · 2025 Open cited source →

What the source record says

Abatement structured as a 50% property-tax reduction in year one rising to the full assessment after 10 years; the AJC estimated over $36 million in savings across the period against $93 million in new taxes. The authority declined to disclose the package's specific terms, so no amountUsd is recorded. About 30 full-time permanent jobs plus a roughly equal number of contractor positions were cited; the authority's larger '700+ jobs' figure includes temporary construction workers and is not recorded. Coordinates are approximate to Ellenwood; a street address of 4350 E Tanners Church Road appears in directory listings that were not retrieved this session and is therefore not asserted.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-06 · source-reported permitted

    The Development Authority of Clayton County approved a 10-year property-tax abatement for a TA Realty subsidiary for the $959 million, 180 MW project on East Tanners Church Road.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID ta-realty-east-tanners-church-ellenwood-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001420

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Ellenwood, GA · Clayton (Approximate location)

Roles

  • Operator: TA Realty

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported permitted

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2025-06 · source-reported permitted

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 180 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Announced investment: $959 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 30 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Incentive reported by the source: Development Authority of Clayton County property-tax abatement (10-year phase-in) · Clayton County, Georgia · 2025

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-10

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →