STREAM U.S. Data Centers at STAMP

source-reported proposed

Stream U.S. Data Centers LLC

Alabama · Genesee County · New York

Reported planned 500 MWSource updated 21 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for STREAM U.S. Data Centers at STAMP.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Stream U.S. Data Centers LLC
Address and locality
Alabama · Genesee County · New York
Official metro area
Outside an official metropolitan boundary
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
21 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001384

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Land area
90 acres (source-reported; parcel boundary not established)
Announced investment
$19.46 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
125 permanent · 1,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Genesee County IDA PILOT / host community agreement · Genesee County, Town of Alabama, and Oakfield-Alabama Central School District, New York · 2026 · $285 million (as stated) Open cited source →
  • Genesee County IDA sales-tax exemption · Genesee County and New York State · 2026 · $1.43 billion (as stated) Open cited source →
  • Genesee County IDA mortgage-recording-tax exemption · Genesee County, New York · 2026 · $31 million (as stated) Open cited source →

Provider notes

Community. Organized, documented opposition. The Tonawanda Seneca Nation, whose territory borders the site, wrote in April 2025 that it "strongly opposes any allocation of low-cost hydropower to a data center at STAMP"; more than 100 environmental, faith and human rights organizations plus 500 individuals statewide signed a letter opposing the project, and Stream's FIRST, smaller STAMP proposal was cancelled following a lawsuit by the Nation. The earlier proposal drew "nearly 800 written comments, 50 spoken comments made at a public hearing."

What the source record says

Proposed three-building hyperscale campus at the Western New York Science, Technology and Advanced Manufacturing Park (STAMP), Town of Alabama, Genesee County - by capital investment the largest data center proposal found for New York in this run. GCEDC states a "$19.46 billion" capital investment and "$285 million in PILOT/host revenues" for Genesee County, the Town of Alabama and the Oakfield-Alabama Central School District, with a public hearing "Thursday, March 19 at 7 p.m. at the Town of Alabama Fire Hall, 2230 Judge Road, Basom, NY 14013." Investigative Post reports the incentive package as "$1.46 billion in tax breaks for the creation of 125 jobs," of which "$1.43 billion in sales tax breaks" and "a $31 million mortgage tax break"; those two components are recorded as separate subsidy entries rather than the rounded total. capacityMw.planned = 500 records the sentence "Stream has said it will use 500 megawatts of electricity, more than 80 percent of all the power available at the STAMP industrial park" - this is stated electricity USE, not a certified IT load or an interconnection award. CONFLICTING FIGURES, recorded honestly: (a) acreage - Investigative Post says the campus spans "over 90 acres at the 1,250-acre industrial park" and landAcres is set to 90; an aggregator listing gives 130 acres and was NOT verified, so it is not used. (b) construction jobs - GCEDC's CEO is quoted at "an additional 1,000 workers temporarily," while "the agency reports on its cost-benefit analysis for the project which says construction will employ more than 16,000"; the lower, attributed figure is recorded. (c) capital cost has moved from "$6.3 billion a year ago" to "$11 billion" to "$19 billion"; the GCEDC-published $19.46B is used. Confirmed absences (2026-09-09): no source fetched states a water withdrawal volume for the campus, a confirmed hydropower allocation (the Tonawanda Seneca Nation letter opposes a prospective allocation, which is not the same as one being granted), or a construction start date - so no energy field is recorded. aiClassification is 'likely': the project is universally described as an AI-boom data campus but no fetched source states the workload. Coordinates are geocoded to the Town of Alabama, Genesee County, NOT to a confirmed parcel. This is a REQUESTED figure, not a confirmed/awarded PILOT -- at the time of this reporting (2026-07) Gov. Hochul was considering a moratorium measure that could block it entirely. Flag for hand review: record explicitly as 'requested', not granted. SUBSIDY NOT RECORDED AS A FIELD (maintainer adjudication 2026-09-10): reporting describes a REQUESTED package worth about $1.46bn from the Genesee County IDA for the STAMP site, not an awarded one — at the time of the 2026-07 reporting the Governor was weighing a moratorium measure that could block it entirely. The `subsidies` schema has no granted-versus-requested distinction, so publishing the figure there would present unawarded money as awarded. Recorded here instead; promote it to a `subsidies` entry only once an executed IDA agreement is in hand.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-03 · source-reported proposed

    GCEDC scheduled a public hearing on the tax-incentive package for the enlarged $19.46 billion application.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID stream-stamp-alabama-ny. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Independently reviewed match

This exact source identifier is linked to STREAM U.S. Data Centers at STAMP (Project Double Reed). The licensed row remains a separate discovery record.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001384

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Alabama, NY · Genesee (Approximate location)

Roles

  • Operator: Stream U.S. Data Centers LLC

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-03 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 90 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Announced investment: $19.46 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 125 permanent · 1,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Genesee County IDA PILOT / host community agreement · Genesee County, Town of Alabama, and Oakfield-Alabama Central School District, New York · 2026 · $285 million (as stated)

    Whether the incentive was approved, awarded or received is not established.

  • Incentive reported by the source: Genesee County IDA sales-tax exemption · Genesee County and New York State · 2026 · $1.43 billion (as stated)

    Whether the incentive was approved, awarded or received is not established.

  • Incentive reported by the source: Genesee County IDA mortgage-recording-tax exemption · Genesee County, New York · 2026 · $31 million (as stated)

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →