Project Swan

source-reported cancelled

Ryan Companies (end operator TBD)

923 Wilkinson Road · Lakeland · Polk County · Florida

Capacity not established; source review excludes the published figureSource updated 2 October 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Project Swan.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Ryan Companies (end operator TBD)
Address and locality
923 Wilkinson Road · Lakeland · Polk County · Florida
Official metro area
Lakeland-Winter Haven, FL
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
2 October 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001270
Capacity held out of the public projection.

100 MW is described as contingent utility demand, not a demonstrated planned IT-capacity value. The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Lakeland ElectricUtility as named by the provider.
Power source
GridProvider label.
Cooling
Not establishedThe provider reports water information but no cooling type.
Land area
60.5 acres (source-reported; parcel boundary not established)
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Energy. Bay News 9 (2026-07-06) reported that Project Swan would need about 100 MW, contingent on Lakeland Electric being able to supply it. The mayor said the utility's largest current customer is 18 MW.

Water. The developer said water use would be limited to everyday operational needs, not server cooling. The cooling method was not identified.

Community. More than 50 residents attended the June 1, 2026 Lakeland City Commission meeting to oppose the proposed 'Project Swan' hyperscale data center, with 18 speaking against it during audience comments. Resident Magdalene DuPree called the project 'a bad fit' and objected to a facility 'extracting value from us.' A grassroots petition campaign and coalition rally pushed the City Commission to consider a temporary data-center moratorium. No organized support for the project was documented in coverage reviewed.

What the source record says

600,000 sq ft across 3 buildings on 60.5 acres (4 parcels, near 923 Wilkinson Rd). Zoning may prohibit the project — data centers are not in Lakeland's Land Development Code — and part of the site is unincorporated Polk County, requiring annexation.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · source-reported proposed

    600,000 sq ft / 3-building proposal at Old Tampa Hwy & Wilkinson Rd; zoning may prohibit and site needs annexation.

    Open cited source →

  2. 2026-06 · source-reported cancelled

    CONFLICTING REPORTING - flag for maintainer judgment before applying. A 2026-06-03 city clarification (WUSF/LkldNow 'Still Active') said the applicant only withdrew from a June 3 Development Review Team meeting, not the application itself, after it was mistakenly marked withdrawn in the city's iMS system. But this 2026-09-01 piece states flatly the application 'had already been withdrawn in June' and that no data-center applications were pending when Lakeland passed its 1-year, 50MW-threshold moratorium on 2026-08-03. Reporting as cancelled on the more recent, more specific source, but the earlier contradiction should be checked.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID ryan-companies-project-swan-lakeland-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001270

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 923 Wilkinson Road, Lakeland, FL · Polk (Exact location)

Roles

  • Operator: Ryan Companies (end operator TBD)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-06 · source-reported cancelled

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 60.5 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Lakeland Electric

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-02

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →