This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for QTS Eagle Mountain II.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- QTS Data Centers
- Address and locality
- Fairfield · Utah County · Utah
- Official metro area
- Provo-Orem-Lehi, UT
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 650 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 15 August 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001202
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Sweetwater Industrial Park Community Reinvestment Project Area #3 (Title 17C) — 61% of Real Property Tax Increment plus 74% of Personal Property Tax Increment reimbursed per phase, 20 years per phase (40-year maximum); Participation Agreement signed with QTS Eagle Mountain I, LLC, which by its own terms covers this parcel's acreage · Eagle Mountain City, UT · 2023 Open cited source →
What the source record says
Sweetwater Industrial Park Community Reinvestment Project Area #3 (Eagle Mountain Redevelopment Agency, Title 17C): 61% of Real Property Tax Increment plus 74% of Personal Property Tax Increment, reimbursed per Phase for 20 years per phase (not to exceed 40 years total), from Utah County, Alpine School District, Eagle Mountain City, Central Utah Water Conservancy District, and the Unified Fire Service Area. The signed CRA Participation Agreement's Participant is QTS Eagle Mountain I, LLC — there is no separate agreement naming "QTS Eagle Mountain II, LLC." This parcel (38:707:0002, 98.043 acres) is covered by the Sweetwater CRA #3 agreement with QTS Eagle Mountain I, LLC, which explicitly includes this parcel's acreage: the Agreement's own recitals and the amended Project Area's Table 1 Parcel List define the ~193-acre Project Area, and its terms, as spanning both the QTS Eagle Mountain I parcel (38:707:0001, 95.153 acres) and the QTS Eagle Mountain II parcel by acreage. A 2nd Amendment (approved August 20, 2024) changed only the payment mechanics — allowing personal-property reimbursements to be paid directly to QTS's colocation end-clients — and did not alter the 61%/74%/20yr/40yr terms.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Data Center Growth in Utah and the United States — Data Summary, April 2026 (Planned Data Centers in Utah, March 2026) · Kem C. Gardner Policy Institute, University of Utah
- Eagle Mountain RDA Board packet — Sweetwater Industrial Park CRA #3 Amended Project Area Plan & Participation Agreement terms (August 1, 2023) · Eagle Mountain Redevelopment Agency via Utah Public Notice Website
- Eagle Mountain RDA Board packet — Sweetwater #3 CRA Participation Agreement Second Amendment (QTS Eagle Mountain I, LLC), August 20, 2024 · Eagle Mountain Redevelopment Agency via Utah Public Notice Website
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID qts-eagle-mountain-ii-fairfield-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001202
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Fairfield, UT · Utah (Approximate location)
Roles
- Operator: QTS Data Centers
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
Power capacity
- Reported capacity: Planned: 650 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Incentive reported by the source: Sweetwater Industrial Park Community Reinvestment Project Area #3 (Title 17C) — 61% of Real Property Tax Increment plus 74% of Personal Property Tax Increment reimbursed per phase, 20 years per phase (40-year maximum); Participation Agreement signed with QTS Eagle Mountain I, LLC, which by its own terms covers this parcel's acreage · Eagle Mountain City, UT · 2023
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-08-15
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.