Project Turbo (Gainesville Data Center)

source-reported cancelled

Project Turbo, LLC (developer; end user undisclosed)

Gainesville · Hall County · Georgia

Capacity not statedSource updated 14 October 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Project Turbo (Gainesville Data Center).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Project Turbo, LLC (developer; end user undisclosed)
Address and locality
Gainesville · Hall County · Georgia
Official metro area
Gainesville, GA
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Not stated
Source freshness
14 October 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001167
Dated source review

The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.

  • Source review: Provider history requires care: The cancellation history describes a December 11, 2025 withdrawal; 2026-10-14 is the provider observation/update date.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Land area
119 acres (source-reported; parcel boundary not established)
Announced investment
$1.2 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.

What the source record says

Three main buildings totalling about 900,000 sq ft plus an electrical substation, on a site currently used as an automotive salvage yard. Records submitted to the Georgia Department of Community Affairs put the value at $1.2 billion and projected annual tax revenue at $25 million. No megawatt figure has been disclosed. Coordinates are approximate to O'Kelly Road.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

Historical event dates held out.

The provider context describes a December 11, 2025 withdrawal, while the history labels it 2026-10-14, an observation/update date. The event date is withheld pending reconciliation.

  1. Date withheld after review · source-reported proposed

    Zoning request filed for a 119-acre site on O'Kelly Road; the applicant asked that commissioners defer discussion to the September 15 planning commission meeting.

    Open cited source →

  2. Date withheld after review · source-reported cancelled

    On Dec 11, 2025, Project Turbo, LLC withdrew its special-use application for the data center at 2400 O'Kelly Rd. The BOC rezoned the parcel to light industrial, which does not by itself allow a data center.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID project-turbo-okelly-road-gainesville-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001167

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Gainesville, GA · Hall (Approximate location)

Roles

  • Operator: Project Turbo, LLC (developer; end user undisclosed)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: Date withheld after review · source-reported proposed

    Status history supplied by the source.

  • Status history: Date withheld after review · source-reported cancelled

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 119 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Announced investment: $1.2 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →