Project Hazelnut

source-reported proposed

NorthPoint Development (NP Hazleton Holdings 1 LLC)

Hazle Township · Luzerne County · Pennsylvania

Capacity not statedSource updated 12 September 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Project Hazelnut.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
NorthPoint Development (NP Hazleton Holdings 1 LLC)
Address and locality
Hazle Township · Luzerne County · Pennsylvania
Official metro area
Scranton--Wilkes-Barre, PA
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
12 September 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001161

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
PPL ElectricUtility as named by the provider.
Cooling
Not establishedThe provider reports water information but no cooling type.
Land area
1,283 acres (source-reported; parcel boundary not established)
Community response
Provider label: litigationCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
mixed useCompute Atlas classification, not a DataCenterData finding.
Announced
2024Provider-reported announcement date.

Provider notes

Water. At a February 2026 DEP hearing the developer described a maximum of 2.8 million gallons of treated wastewater from the Greater Hazleton Joint Sewer Authority, with domestic water supplied via CAN DO, which serves the Humboldt industrial parks; the campus's water usage was said to be able to reduce Black Creek by 5.5%. The source does not state an averaging period for the 2.8 million gallon figure, so no reportedMgd rate is recorded here.

Community. Hazle Township denied NorthPoint's land development application; NorthPoint is appealing in Luzerne County Court of Common Pleas and created a $30M fund to offset potential short-term utility rate increases for residents during the appeal. Separately, NorthPoint committed to a $165M Community Benefit Fund: $45M Direct Resident Grant Fund ($10,000 grants to eligible households), $15M Community Support Fund (education/workforce training/arts/recreation/youth), and a $105M long-term commitment ($7M/year for 15 years) toward a new local police department and reduced trash fees. …

What the source record says

Site: Humboldt North Industrial Park, Hazle Township, Luzerne County PA (within a larger ~3,000-acre industrial park); a few miles from Amazon's nuclear-adjacent data center campus (acquired from Talen Energy) - proximity only, AWS is NOT a confirmed tenant/operator for Project Hazelnut; NorthPoint's own project site names no end-tenant, describing this as a speculative build. Phased: Phase 1 (5 buildings) to begin Q4 2026, Phase 2 (3 buildings) Q1 2028, Phase 3 (7 buildings) Q2 2029. Developer projects ~900-1,300 construction jobs and ~900-950 permanent jobs ($50K-$158K salary range) - not yet delivered, so omitted from the jobs field; similarly $13.47M in projected county tax revenue over 20 years is a projection, not a subsidy. First surfaced publicly in connection with PA's Permit Fast Track Program (Executive Order 2024-04). NorthPoint's own site explicitly frames this as a general 'data center campus' supporting 'cloud platforms, digital payments, streaming, and healthcare systems' - no AI-specific language found; classified 'mixed_use' given hyperscale-tier campus scale makes AI workloads plausible even absent explicit branding.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · source-reported proposed

    Hazle Township denied NorthPoint's land development application for the 15-building, ~1,283-acre campus; NorthPoint appealed in Luzerne County Court of Common Pleas and created a $30M fund to offset potential resident utility-rate impacts during the appeal.

    Open cited source →

  2. 2026-06 · source-reported proposed

    Hazle Township passed a 6-month moratorium/curative amendment pausing data center development.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID project-hazelnut-hazle-township-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001161

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): mixed use

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Hazle Township, PA · Luzerne (Exact location)

Roles

  • Operator: NorthPoint Development (NP Hazleton Holdings 1 LLC)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2024

    Provider-reported announcement date.

  • Status history: 2026 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-06 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 1,283 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: PPL Electric

    Utility as named by the provider.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: litigation

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-12

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →