Patmos Fairfield Colocation Data Center

source-reported proposed

Patmos

Fairfield · Jefferson County · Alabama

Capacity not established; source review excludes the published figureSource updated 28 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Patmos Fairfield Colocation Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Patmos
Address and locality
Fairfield · Jefferson County · Alabama
Official metro area
Birmingham, AL
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
28 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001108
Capacity held out of the public projection.

Row note expressly says the 45 MW aggregator figure is unverified and deliberately omitted. The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Alabama PowerUtility as named by the provider.
Power source
GridProvider label.
Cooling
Not establishedThe provider reports water information but no cooling type.
Announced jobs
50 permanent · 120 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
mixed useCompute Atlas classification, not a DataCenterData finding.

Provider notes

Water. Roughly 10,000 gallons per day, using closed-loop cooling.

Community. WBRC (13 Aug 2026) reports "Hundreds pack Fairfield town hall over proposed data center inside former Walmart", with residents raising health risks, rising utility bills and community benefit. Patmos's founder answered noise concerns by saying "you'll hear the equivalent of a weed wacker" when generators run and that operations would be "quieter than the Walmart"; Patmos said "the only environmental impact is water use." Resident Bessie Bell questioned whether the project would help Fairfield's development. …

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Announced investment: Row note expressly says investment was not disclosed and deliberately omitted.
  • Provider energy note: New 20/45 MW figures reintroduce the expressly unverified capacity claim.
  • Cooling: Row context identifies water use but does not support a cooling type.
  • Reported water use: Row context does not support the asserted 10,000-gallon-per-day measure.

What the source record says

Retrofit of a former Walmart Supercenter in Fairfield into a colocation data center. WBRC states: "Patmos would bring around 50 long-term jobs, plus roughly 120 construction workers during the build" and "If approved, construction could start in September, with the first phase completed by January or February 2027 and a larger expansion planned for 2028." CAPACITY AND INVESTMENT DELIBERATELY OMITTED — WBRC explicitly does not disclose either; an aggregator (servercountry.org) lists a "Fairfield Colocation Data Center" at 45 MW, which is NOT verified here and not cited. COORDINATES ARE THE FAIRFIELD MUNICIPAL CENTROID, not the building: the source identifies the site only as "the former Walmart Supercenter", no street address, and an Overpass query over the Fairfield bounding box returned no Walmart-named or former-retail building in OSM. Tighten this before mapping. STATUS is "proposed" — construction was conditional on approval as of 13 Aug 2026; if the September 2026 groundbreaking happened, this should move to under_construction, which is worth re-checking since that date has now passed. This is a genuinely distinct site from qts-marvel-bessemer-al (different operator, different city) though both sit in the same Birmingham-west corridor.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID patmos-fairfield-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001108

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): mixed use

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Fairfield, AL · Jefferson (Approximate location)

Roles

  • Operator: Patmos

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Alabama Power

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Permits, incentives, jobs and proceedings

  • Announced jobs: 50 permanent · 120 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-28

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →