This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Black Bear AI Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Oklahoma AI Ventures LLC (Jericho Energy Ventures / Comstock Holding Companies JV)
- Address and locality
- Perry · Noble County · Oklahoma
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 2 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001087
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- Mixed
- AI-use label (provider)
- confirmed
- Announced
- April 2025
Provider notes
Energy. Developer describes behind-the-meter natural gas generation from its own producing acreage with grid power as a supplement; a newly built 345 kV line crossing the site is stated to deliver 20 MW of available capacity from January 2026.
What the source record says
Flagship campus of the Jericho Energy Ventures / Comstock 50-50 joint venture (Oklahoma AI Ventures LLC), sited on Jericho's ~18,000-acre subsurface portfolio with roughly 60 miles of gas, power and water infrastructure between Oklahoma City and Tulsa. The 8-K names Pawnee and Noble counties and states upwards of 4,000 acres secured for development options; no capacity figure is given by the developer, so none is recorded here. Coordinates are approximate to Perry, the Noble County seat.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-06-10 · source-reported proposed
Oklahoma AI Ventures LLC joint venture formed; land assemblage under way in Pawnee and Noble counties.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- AI Data Centers — Black Bear campus · Jericho Energy Ventures
- Comstock Holding Companies Form 8-K exhibit — Oklahoma AI Ventures JV with Jericho · U.S. Securities and Exchange Commission
- Oklahoma Data Center Map — Black Bear AI Data Center Campus, Perry · dcmap.us
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID oklahoma-ai-ventures-black-bear-noble-county-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001087
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Perry, OK · Noble (Approximate location)
Roles
- Operator: Oklahoma AI Ventures LLC (Jericho Energy Ventures / Comstock Holding Companies JV)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: April 2025
Provider-reported announcement date.
- Status history: 2026-06-10 · source-reported proposed
Status history supplied by the source.
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: Mixed
Provider label.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-02
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.