This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for PORTS-Pike Technology Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- SB Energy
- Address and locality
- Piketon · Pike County · Ohio
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 10,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001043
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- AEP Ohio
- Power source
- Mixed
- Announced jobs
- 2,000 permanent · 10,000 construction
- Community response
- Provider label: mixed
Provider notes
Energy. S-1: the campus is "designed to include 8.0 GW-IT of data center capacity, representing 10 GW of gross power load expected to be supported by the PJM transmission system and new neighbouring gas-fired generation facilities" - hence "mixed". The 9.2 GW of gas is new build, not a reused plant; the site is the former Portsmouth uranium-enrichment complex, whose historic power came over OVEC coal-fired transmission (X-533 switchyard, de-energised 2008, decommissioned 2011). …
Community. Documented local support alongside contamination-legacy distrust. Support: State Sen. Shane Wilkin - "It’s just going to be a generational change for this area"; SODI executive director Steve Shepherd called it "a model for the country"; the Scioto Valley-Piketon Area Council of Governments chair framed it as moving contaminated residential land to industrial use. Concern: a neighbouring farmer with contaminated property ("This is the most contaminated place around here"), and Conserve Ohio on water, transmission and the precedent of siting hyperscale projects on legacy DOE land. …
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- On-site generation: The source note says the 9.2 GW of gas generation is at neighboring plants about five miles away that the developer does not expect to own or operate, so it is not established as on-site generation.
What the source record says
Officially "PORTS-Pike Technology Campus"; formerly tracked under the pre-announcement Ohio entity New Day Data Centers LLC, a name that appears nowhere in the SEC S-1 or SB Energy’s own announcements. Developer/operator is SB Energy (SoftBank-controlled); the DOE lease was signed 2026-02-26 by its subsidiary Pike County Portsmouth DC LLC. CAPACITY - three distinct figures that must not be conflated: 8.0 GW-IT of contracted compute (8,024 MW-IT; NVIDIA guarantees the initial 4.25 GW-IT with an option on the remaining 3.78 GW-IT), 10 GW of gross power load (the capacityMw.planned value here), and 9.2 GW of new gas generation. OFFTAKE: on 2026-08-17 SB Energy subsidiaries signed 17 twenty-year triple-net leases with OpenAI, with rent commencement conditioned on interconnection and generation being available; NVIDIA provided a residual-value guaranty capped at $105B and separately bought $1.5B of non-voting stock. LAND: landAcres is intentionally omitted - the DOE lease covers 189 acres (Batch 1) on which "one data center building is expected to be constructed", while the S-1 places the buildings "across several thousand acres of private property"; the widely-cited 3,700/3,777 acres is the whole federal reservation, which also hosts the separately tracked Oklo Aurora project, Centrus and the DUF6 plant. INVESTMENT: investmentUsd intentionally omitted - $10B (DOE, March) and $30-40B (project site) describe the same ~800 MW first phase and cannot both be right, the $67.2B total appears only as one trade outlet’s unattributed rollup, and the S-1 states no total capex. SUBSIDIES: none awarded - the Ohio Tax Credit Authority minutes record no award, no JobsOhio award was found, and Ohio paused new data-centre tax exemptions in May 2026; a county PILOT is under negotiation because the leased federal land yields no property tax. STATUS: early civil works began after the 2026-03-20 groundbreaking, though the S-1 lists construction as not started, with first capacity in 2028 and full buildout 2032. Distinct from oklo-aurora-pike-county-oh on the same broader site - do not merge or double-count.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-03-20 · source-reported under construction
Groundbreaking 2026-03-20 on the former Portsmouth Gaseous Diffusion Plant site; 10 GW gross power load, 9.2 GW of new natural gas generation.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- $67.2B PORTS Technology Campus gains FAST-41 status, advancing Ohio AI megaproject · Construction Review Online
- Piketon set to become ground zero for new energy megasite · Scioto Valley Guardian
- SB Energy, Inc. Form S-1 registration statement (PORTS-Pike Technology Campus) · SEC EDGAR
- CX-270875: Lease of Real Property (Batch 1 Property) at Portsmouth Gaseous Diffusion Plant · U.S. Department of Energy (NEPA)
- CX-270956: Environmental Site Assessment of Batch 1 Leased Property at Portsmouth Gaseous Diffusion Plant · U.S. Department of Energy (NEPA)
- FACT SHEET: DOE is Ensuring Affordable Energy Access in Ohio While Powering the Future of AI · U.S. Department of Energy
- Partnership Ensures Affordable Energy, Powers AI Future at Portsmouth Site · U.S. DOE Office of Environmental Management
- PORTS Technology Campus is Latest to Gain FAST-41 Coverage · Federal Permitting Improvement Steering Council
- NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute · NVIDIA
- PORTS-Pike Technology Campus — project resources · PORTS-Pike Technology Campus (project site)
- Feds announce huge natural gas plant, data center project in southern Ohio · Statehouse News Bureau
- A data center proposed at site of former uranium enrichment plant near Piketon · WOUB Public Media
- PORTS Technology Campus (official site): SoftBank Group / SB Energy, 10 GW data center incl. 9.2 GW gas generation, first 800 MW phase construction 2026 · PORTS Technology Campus / SB Energy
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID new-day-ports-technology-campus-piketon-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001043
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Piketon, OH (Approximate location)
Roles
- Operator: SB Energy
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026-03-20 · source-reported under construction
Status history supplied by the source.
Power capacity
- Reported capacity: Planned: 10,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: AEP Ohio
Utility as named by the provider.
- Power source: Mixed
Provider label.
Permits, incentives, jobs and proceedings
- Announced jobs: 2,000 permanent · 10,000 construction
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.