Homer City Energy Campus

source-reported under construction

Homer City Redevelopment

Homer City · Indiana County · Pennsylvania

Capacity not established; source review excludes the published figureSource updated 12 September 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Homer City Energy Campus.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Homer City Redevelopment
Address and locality
Homer City · Indiana County · Pennsylvania
Official metro area
Outside an official metropolitan boundary
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
12 September 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000793
Capacity held out of the public projection.

The cited redevelopment page describes up to 4.4 GW of power generation to support data centers; the stored 4,500 MW is not a stated data-center capacity. The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
PJM (via FirstEnergy Pennsylvania Electric)Utility as named by the provider.
Power source
On-site gasProvider label.
On-site generation
4,500 MW (source-reported)On-site figures often describe backup generators rather than primary supply; read the provider energy note.
Cooling
Not establishedThe provider reports water information but no cooling type.
Land area
3,200 acres (source-reported; parcel boundary not established)
Announced investment
$10 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
1,000 permanent · 10,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
2 April 2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Pennsylvania state grant — natural-gas pipeline interconnection · Pennsylvania · 2025 · $5 million (as stated) Open cited source →

Provider notes

Energy. Redevelopment of the former Homer City coal plant (Pennsylvania's largest, demolished 2023–25) into what developers call the largest US natural-gas plant powering an on-site AI data-center campus — seven GE Vernova 7HA.02 turbines cited at 'up to 4.4–4.7 GW' (a ceiling; no confirmed point value). EQT is to supply Marcellus gas; first power is targeted for 2027. PA DEP issued the air-quality plan approval on Nov 20, 2025. Developers describe the redevelopment site as spanning more than 3,200 acres.

Water. A legacy 1,800-acre reservoir (Two Lick) remains available for cooling; NPDES permit PAD320011 (June 2026) covers Two Lick Creek outfalls. No cooling-water volume (MGD) is disclosed.

Community. A strong local-revival narrative (an economic anchor after the 2023 coal-plant closure, backed by state officials) meets organized environmental opposition — the air permit drew 500+ comments and Clean Air Council opposition citing ~17M tons CO2e/year, potentially Pennsylvania's largest single pollution source. Developers project ~10,000 construction and ~1,000 permanent jobs.

What the source record says

EPC contractor: Kiewit.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-04-02 · source-reported proposed

    Announced as conversion of former Homer City coal plant (retired 2023); $10B project; 3,200 acres; $5M PA state grant; environmental permit challenged by groups

    Open cited source →

  2. 2025 · source-reported under construction

    Ground broken; ~1,200 workers on-site as of 2026; first vertical steel beams raised; GE Vernova turbine deliveries beginning 2026; power targeted 2027

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID homer-city-energy-campus-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000793

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Homer City, PA · Indiana (Exact location)

Roles

  • Operator: Homer City Redevelopment

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2 April 2025

    Provider-reported announcement date.

  • Status history: 2025-04-02 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 3,200 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: PJM (via FirstEnergy Pennsylvania Electric)

    Utility as named by the provider.

  • Power source: On-site gas

    Provider label.

  • On-site generation: 4,500 MW (source-reported)

    On-site figures often describe backup generators rather than primary supply; read the provider energy note.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Permits, incentives, jobs and proceedings

  • Announced investment: $10 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 1,000 permanent · 10,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Pennsylvania state grant — natural-gas pipeline interconnection · Pennsylvania · 2025 · $5 million (as stated)

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-12

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →