This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Global AI Windsor Data Center (former Kodak/Carestream campus).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Global AI
- Address and locality
- Windsor · Weld County · Colorado
- Official metro area
- Greeley, CO
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 27.5 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 30 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000698
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Poudre Valley Rural Electric Association
- Power source
- Mixed
- Cooling
- Not established
- Land area
- 41 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: contested
- AI-use label (provider)
- confirmed
- Announced
- November 2025
Provider notes
Energy. Poudre Valley REA told the county it can supply only 35 MW until mid-2028, dropping to about 27 MW at the start of 2028 and declining further in 2029, citing limited wholesale supply from Tri-State Generation and Transmission. Global AI's zoning application says later phases would be powered on-site with Bloom solid-oxide fuel cells; no state air permit had been filed as of 2026-07-29.
Water. A Weld County review published 2026-08-07 found the applicant still had to show proof of water supply. Windsor has issued only a non-binding will-serve letter for water and wastewater contingent on annexation.
Community. Weld County posted stop-work orders on the property on 2026-05-07, 2026-06-11 and again on an unspecified date for un-permitted construction, and issued a formal order to abate on 2026-07-20. The county received hundreds of public comments; the site is in the Use by Special Review process. Windsor states it has not approved or endorsed the project.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Street address: The captured provider context contains an unresolved street-address support or consistency issue. Street is newly supplied but absent from the row note.
- Announced permanent jobs: 200 is absent from the row note.
- Announced construction jobs: 1,500 is absent from the row note.
What the source record says
Global AI, a New York-based firm, bought a 438-acre former Kodak/Carestream property in unincorporated Weld County near Windsor in November 2025 and is developing a 41-acre data center on it. Phase 1 is stated at 27.5 MW with an ambition to reach 1 GW; no timeline for later phases has been shared. The company says it plans to operate the site alongside Nvidia and Humain. Coordinates are approximate (former Kodak campus, Eastman Park Drive area), not parcel-confirmed.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-08-07 · source-reported under construction
Construction under way on the former Kodak/Carestream buildings; county has repeatedly ordered work stopped pending zoning approval.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Weld County officials have told an AI company to stop construction on a new data center. Three times. (read via Internet Archive) · Colorado Public Radio
- AI Data Center Project Information — Town of Windsor · Town of Windsor, Colorado
- Weld County commissioners approve permit for Global AI data center · KUNC
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID global-ai-windsor-co. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000698
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Windsor, CO · Weld (Approximate location)
Roles
- Operator: Global AI
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: November 2025
Provider-reported announcement date.
- Status history: 2026-08-07 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 41 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 27.5 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Poudre Valley Rural Electric Association
Utility as named by the provider.
- Power source: Mixed
Provider label.
Cooling, water, PUE and WUE
- Cooling: Not established
Provider label: unknown.
Permits, incentives, jobs and proceedings
- Community response: Provider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-30
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.