Licensed lead · not independently verified · dcd-dir-000693

Sioux Falls Technology Park (Gemini Data Center)

source-reported permitted

Gemini Data Center SD LLC

Sioux Falls · Minnehaha County · South Dakota

Reported planned 500 MWSource updated 6 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Sioux Falls Technology Park (Gemini Data Center).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Gemini Data Center SD LLC
Address and locality
Sioux Falls · Minnehaha County · South Dakota
Official metro area
Sioux Falls, SD-MN
Source-reported status
permitted
Provider facility type
data center
Reported capacity
Planned: 500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
6 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000693

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Xcel EnergyUtility as named by the provider.
Power source
GridProvider label.
Land area
164 acres (source-reported; parcel boundary not established)
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
2025Provider-reported announcement date.

Provider notes

Energy. Site adjacent to Xcel's Split Rock substation and Angus Anson power station; an Xcel facility study is in process. The developer committed to funding utility extensions and substation upgrades.

Community. The city council approved rezoning unanimously despite hours of opposing public testimony; a citizen petition drive is gathering signatures that could force the rezoning to a public vote. A state 50-year sales-tax exemption bill failed in the 2026 legislative session.

What the source record says

aiClassification is 'likely' (not 'confirmed'): Gemini is the land developer, no tenant is signed, and only developer aspiration to attract a hyperscale/AI/neocloud tenant is on record. Capacity (500 MW) and acreage per SiouxFalls.Business; an earlier report cited 160 acres. Coordinates are approximate for the northeast Sioux Falls site. As a developer land project with no signed tenant, its water, subsidy, investment, and job figures remain developer projections only (South Dakota has no state income tax and rejected data-center incentive bills); all recorded as honest-zeros pending a confirmed tenant.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · source-reported proposed

    Gemini Data Center SD LLC (a California family office under Michael Anvar) acquired ~164 acres from Xcel Energy northeast of Sioux Falls, adjacent to Xcel's Split Rock substation, and sought city approvals for a data center supporting up to 500 MW. Gemini is the land developer, not the operator; no tenant is signed.

    Open cited source →

  2. 2026-01 · source-reported permitted

    Sioux Falls City Council approved annexation (October 8, 2025) and unanimously approved rezoning from agricultural to light industrial (January 2026), despite hours of opposing testimony. Construction was targeted for 2026 and operation for 2028. The developer committed to funding all utility extensions at its own cost.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID gemini-data-center-sioux-falls-sd. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000693

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Sioux Falls, SD · Minnehaha (Approximate location)

Roles

  • Operator: Gemini Data Center SD LLC

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported permitted

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2025

    Provider-reported announcement date.

  • Status history: 2025 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-01 · source-reported permitted

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 164 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Xcel Energy

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-06

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →