Licensed lead · not independently verified · dcd-dir-000618

Project Matador

source-reported under construction

Fermi America

Amarillo · Carson County · Texas

Capacity not statedSource updated 26 August 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Project Matador.

Exact source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Fermi America
Address and locality
Amarillo · Carson County · Texas
Source-reported status
under construction
Facility type
data center
Reported capacity
Not stated
Source freshness
26 August 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000618

What the source record says

11GW is the long-term ceiling for the HyperGrid campus; near-term company targets include 1GW by end of 2026 and 2.3GW first-phase delivery — these are company goals, not firm commitments. Land acreage reported variously (5,769 acres per DCD July 2025 and 5,855 acres per other sources; later company materials cite 7,570 acres on 7,570 acres); using 5,769 as the earliest confirmed figure, sourced from the gas turbine acquisition announcement. Coordinates approximate (seed-provided; site in Carson County ~12 miles NE of Amarillo, adjacent to DOE Pantex Plant). Fermi America co-founded January 2025 by former Texas Governor and U.S. Energy Secretary Rick Perry, Toby Neugebauer (CEO, departed April 2026 after being fired 'without cause'), and Griffin Perry. IPO raised $682M on Nasdaq under ticker FRMI (October 2025), valuing company at ~$19B at opening; market cap collapsed to ~$3.4B by April 2026 after leadership exits and loss of anchor tenant ($150M LOI canceled December 2025). Company organized as a REIT; had zero revenue at IPO. Investment: equipment financing commitments exceed $600M ($500M MUFG turbine warehouse + $200M Keystone/Cape facility); projected total project cost $70–90B is a range/projection, not a firm figure — omitted from investmentUsd per data-rigor policy. Jobs: 50,000+ projected across campus lifetime — projection only, omitted from jobs field. Nuclear campus name in NRC COLA filings: 'President Donald J. Trump Advanced Energy and Intelligence Campus'; publicly marketed as Project Matador / HyperGrid.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · source-reported proposed

    Fermi America founded January 2025 by Rick Perry, Toby Neugebauer, and Griffin Perry. Project Matador announced on ~5,769-acre site in Carson County under 99-year lease with Texas Tech University System, adjacent to DOE Pantex Plant.

    Open cited source →

  2. 2025 · source-reported under construction

    600MW+ natural gas turbines acquired across two deals (July 2025); COLA for four AP1000 reactors filed with NRC June 17 2025; NRC accepted COLA for review September 2025; TCEQ preliminary approval for first 6GW gas generation (November 2025); geotechnical work commenced on campus.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID fermi-matador-amarillo-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →