This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Westline Site / Dove Creek Technology Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Beacon Data Centers (via Westline TX Holdings)
- Address and locality
- San Angelo (Tankersley area, unincorporated) · Tom Green County · Texas
- Official metro area
- San Angelo, TX
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 21 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000174
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Concho Valley Electric Co-op Inc
- Land area
- 1,240 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: contested
Provider notes
Community. A proposed 12-month data-center moratorium was rejected by county commissioners; local opposition documented.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Cooling: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
What the source record says
Anchored to TCEQ Air Quality Permit application #184380 filed by Westline TX Holdings (Beacon Data Centers). Site is ~1,240 buildable acres near the FM 2335 / US-67 South junction along Spring Creek, Precinct 4, Tom Green County. County commissioners rejected a proposed 12-month data-center moratorium 2026-06-02, citing litigation risk — an implicit but real signal the project is proceeding through the county's process. No MW capacity or investment figure disclosed in any source reviewed; left null per zero-fabrication rule. Coordinates are an approximate geocode of the named road junction (Tankersley, TX), not a parcel centroid — recommend verifying against the TCEQ permit's exact site description if available. Single-source (Concho Observer reporting a TCEQ air-quality permit application); recorded reported-tier pending a second corroborating primary.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-06-02 · source-reported proposed
proposed per TCEQ Air Quality Permit No. 184380 application (Westline TX Holdings)
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- TCEQ Air Quality Permit No. 184380 application (Westline TX Holdings) · Texas Commission on Environmental Quality (reported via The Concho Observer)
- Tom Green County Commissioners Reject Data Center Moratorium · SanAngeloLIVE
- Developer sheds light on Dove Creek data center as commissioners mull options · ConchoValleyHomepage.com
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID beacon-westline-dove-creek-san-angelo-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000174
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- San Angelo (Tankersley area, unincorporated), TX · Tom Green (Approximate location)
Roles
- Operator: Beacon Data Centers (via Westline TX Holdings)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026-06-02 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 1,240 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Concho Valley Electric Co-op Inc
Utility as named by the provider.
Permits, incentives, jobs and proceedings
- Community response: Provider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-21
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.