Calvert Infrastructure Hub

source-reported proposed

Beacon Data Centers

Calvert · Mobile County · Alabama

Capacity not statedSource updated 28 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Calvert Infrastructure Hub.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Beacon Data Centers
Address and locality
Calvert · Mobile County · Alabama
Official metro area
Outside an official metropolitan boundary
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
28 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000172

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Alabama PowerUtility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Land area
650 acres (source-reported; parcel boundary not established)
Announced investment
$6 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
250 permanent · 1,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

Provider notes

Energy. Developer's campus page states "Alabama Power will service the site using high voltage power lines they already own." No megawatt figure is given for this campus on that page.

Water. Developer states verbatim: "The site will utilize a closed-loop water system. Evaporative cooling will not be used." That is an explicit recirculating circuit with evaporative rejection ruled out — closed_loop, not `air` (a water circuit exists) and not `evaporative`. No withdrawal or consumption figure is stated.

Community. Beacon held a community open house on June 17, 2026 attended by more than 50 residents; the project is drawing questions from some nearby residents about land use, utilities and long-term impact on the rural community, without organised opposition reported in this coverage.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Reported water use: The source water note states that no withdrawal or consumption figure is given for this site.

What the source record says

Developer's campus page states verbatim: "A 95 acre development out of a 650 acre lot" with "less than 15% of the site planned for development"; "$6 billion"; two data center buildings plus supporting infrastructure; "2027 First Building Completed"; currently in a "planning, engineering, and community engagement phase"; "up to 1,000 construction workers at peak construction" and "250 staff for operations" at an "average salary of $115,000". landAcres records the 650-acre site; the built footprint is 95 acres. NO CAPACITY RECORDED: the campus page states no MW figure. Secondary coverage attributes 6 GW to Beacon's WHOLE portfolio of six-plus campuses across Alberta, New Brunswick, Tom Green County TX, Kern County CA and Calvert — that is a portfolio figure, not this site's capacity, and is deliberately not recorded. COUNTY AMBIGUITY: Beacon's own page places the hub in Mobile County and that is what is recorded, but Calvert is an unincorporated community straddling Mobile and Washington counties, and the OSM village node used for the coordinate sits on the Washington County side. Verify the county against the parcel before publishing. SUBSIDY: no incentive or abatement is mentioned on the developer's page; Mobile County and Alabama Commerce records were NOT checked in this run, so this is an unchecked gap, not an audited negative. Coordinates are the Calvert community centroid, not the 650-acre parcel.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID beacon-calvert-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000172

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Calvert, AL · Mobile (Approximate location)

Roles

  • Operator: Beacon Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

Area, acreage and buildings

  • Land area: 650 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Alabama Power

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $6 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 250 permanent · 1,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-28

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →