This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Calvert Infrastructure Hub.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Beacon Data Centers
- Address and locality
- Calvert · Mobile County · Alabama
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 28 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000172
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Alabama Power
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 650 acres (source-reported; parcel boundary not established)
- Announced investment
- $6 billion
- Announced jobs
- 250 permanent · 1,000 construction
- Community response
- Provider label: mixed
- AI-use label (provider)
- likely
Provider notes
Energy. Developer's campus page states "Alabama Power will service the site using high voltage power lines they already own." No megawatt figure is given for this campus on that page.
Water. Developer states verbatim: "The site will utilize a closed-loop water system. Evaporative cooling will not be used." That is an explicit recirculating circuit with evaporative rejection ruled out — closed_loop, not `air` (a water circuit exists) and not `evaporative`. No withdrawal or consumption figure is stated.
Community. Beacon held a community open house on June 17, 2026 attended by more than 50 residents; the project is drawing questions from some nearby residents about land use, utilities and long-term impact on the rural community, without organised opposition reported in this coverage.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Reported water use: The source water note states that no withdrawal or consumption figure is given for this site.
What the source record says
Developer's campus page states verbatim: "A 95 acre development out of a 650 acre lot" with "less than 15% of the site planned for development"; "$6 billion"; two data center buildings plus supporting infrastructure; "2027 First Building Completed"; currently in a "planning, engineering, and community engagement phase"; "up to 1,000 construction workers at peak construction" and "250 staff for operations" at an "average salary of $115,000". landAcres records the 650-acre site; the built footprint is 95 acres. NO CAPACITY RECORDED: the campus page states no MW figure. Secondary coverage attributes 6 GW to Beacon's WHOLE portfolio of six-plus campuses across Alberta, New Brunswick, Tom Green County TX, Kern County CA and Calvert — that is a portfolio figure, not this site's capacity, and is deliberately not recorded. COUNTY AMBIGUITY: Beacon's own page places the hub in Mobile County and that is what is recorded, but Calvert is an unincorporated community straddling Mobile and Washington counties, and the OSM village node used for the coordinate sits on the Washington County side. Verify the county against the parcel before publishing. SUBSIDY: no incentive or abatement is mentioned on the developer's page; Mobile County and Alabama Commerce records were NOT checked in this run, so this is an unchecked gap, not an audited negative. Coordinates are the Calvert community centroid, not the 650-acre parcel.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Calvert - Beacon Data Centers (developer's campus page) · Beacon Data Centers
- Nominatim geocode of Calvert, Alabama — returns both a census place spanning Mobile and Washington counties and a village node (31.1551748, -88.0099997) in Washington County · OpenStreetMap / Nominatim
- Proposed $6B data center campus in Calvert draws questions over growth, utilities, impact · NBC 15 (WPMI)
- Proposed $6B data center campus in Calvert draws questions over growth, utilities, impact · NBC 15 / UTV44
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID beacon-calvert-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000172
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Calvert, AL · Mobile (Approximate location)
Roles
- Operator: Beacon Data Centers
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
Area, acreage and buildings
- Land area: 650 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Alabama Power
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $6 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 250 permanent · 1,000 construction
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-28
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.