Reported geography
Source-reported location for AWS Sprigg Township Data Center Campus (Buck Canyon).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Amazon Web Services (land held via Buck Canyon Properties)
- Address and locality
- Manchester · Adams County · Ohio
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- permitted
- Provider facility type
- data center
- Reported capacity
- Planned: 1,300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 9 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000163
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- AES Ohio
- Power source
- Grid
- Land area
- 1,000 acres (source-reported; parcel boundary not established)
- Announced investment
- $10 billion
- Announced jobs
- 500 permanent
- Community response
- Provider label: contested
- Announced
- February 2026
Provider notes
Energy. AWS will fund, build, own, and operate an on-site substation; site sits on ~1,000 acres including a former DP&L landfill, near the retired J.M. Stuart coal plant.
Community. Sprigg Township passed a 12-month data center moratorium (2026-02-26) after residents learned of the project; a resident-founded group (Conserve Ohio) is pushing a statewide ban on large-scale data centers, citing rising electricity costs and water/environmental concerns.
What the source record says
No formal development proposal has been filed with Adams County per county officials as of Aug 2026, but a U.S. Army Corps of Engineers Nationwide Permit 39 was issued 2026-02-18 covering site work, and the county's own AWS project page states initial earthwork is expected in 2026 (general contractor not yet determined).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-02-18 · source-reported permitted
U.S. Army Corps of Engineers issued Nationwide Permit No. 39 for site work near the former Stuart/Killen power-plant sites.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- AWS - Adams County, OH (official project page) · Amazon / Adams County, OH
- Adams County data center gets federal permit, as voters sign petitions to block it · WCPO
- Adams County residents fear environmental and utility costs of possible data center · WVXU
- Sprigg Township, OH Passes Data Center Moratorium · Food & Water Watch
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aws-sprigg-township-adams-county-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000163
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Manchester, OH · Adams (Approximate location)
Roles
- Operator: Amazon Web Services (land held via Buck Canyon Properties)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported permitted
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: February 2026
Provider-reported announcement date.
- Status history: 2026-02-18 · source-reported permitted
Status history supplied by the source.
Area, acreage and buildings
- Land area: 1,000 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 1,300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: AES Ohio
Utility as named by the provider.
- Power source: Grid
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $10 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 500 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-09
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.