This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Atlas Agro Richland Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Atlas Agro North America
- Address and locality
- 2100 Horn Rapids Road · Richland · Benton County · Washington
- Official metro area
- Kennewick-Richland, WA
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 320 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 12 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000100
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 275 acres (source-reported; parcel boundary not established)
- Announced investment
- $500 million
- Announced jobs
- 100 permanent
- Community response
- Provider label: supported
- Announced
- 22 September 2025
Provider notes
Energy. Project depends on a power line the Bonneville Power Administration plans to build, shared with Atlas Agro's planned fertilizer plant.
Community. Richland's city council unanimously approved the option agreement on 2025-12-02; Tri-City Development Council (TRIDEC) CEO Karl Dye backed the project, tying it to the DOE's Genesis Mission. No opposition, resident concerns, or dissenting hearing testimony documented in this source.
What the source record says
Swiss fertilizer developer Atlas Agro offered the City of Richland just under $24 million for 275 acres in the Northwest Advanced Clean Energy Park, adjacent to its planned zero-carbon nitrate fertilizer plant. The campus would comprise five data center buildings of roughly 500,000 sq ft each, with construction targeted to begin in 2027. Columbia Riverkeeper's February 2026 report puts the campus's power requirement at at least 320 MW. Power would come via a Bonneville Power Administration line serving both the data center and the fertilizer plant. Atlas Agro's North American president describes the data center as 'a partner that helps us build the necessary power and utility infrastructure.' Coordinates are an approximate geocode of the stated address.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-12-02 · source-reported proposed
Richland City Council unanimously approved a land-option agreement with Atlas Agro for 275 acres at 2100 Horn Rapids Road, with a $250,000 nonrefundable option fee.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Richland OKs option agreement for Atlas Agro data center · Tri-Cities Area Journal of Business
- A Closer Look: Columbia River Data Centers (February 2026) — Benton County, Washington · Columbia Riverkeeper
- What to know about 4 major data center proposals for Tri-Cities area · Tri-City Herald (via Yahoo News)
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID atlas-agro-richland-data-center-campus-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000100
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 2100 Horn Rapids Road, Richland, WA · Benton (Approximate location)
Roles
- Operator: Atlas Agro North America
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 22 September 2025
Provider-reported announcement date.
- Status history: 2025-12-02 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 275 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 320 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Announced investment: $500 million
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 100 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: supported
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-12
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.