Operator-listed layer · South Carolina · not independently verified

South Carolina operator-listed data center sites

5 operator-listed sites (mixed units; not added to licensed rows) in South Carolina, as listed by operators on their own websites. Not independently verified and not a census.

5 operator-listed sites (mixed units; not added to licensed rows)1 with a published street and their own page
Read this before using the list.

Each site is what an operator states about itself on its own website, checked against the page DataCenterData captured; each fact links to that page. DataCenterData has not verified these sites independently. The list is not a census: it covers only the operators whose official U.S. portfolio pages could be captured with their robots rules respected. Units are mixed (buildings, facilities, campuses and provider presences where a suite or floor is listed), so the numbers are not building counts, and they are never added to licensed rows or reviewed records.

Showing all 5 operator-listed sites in South Carolina, sorted by name.

  1. DartPoints Charleston Data Center (CHS01)

    Listed by DartPoints on its website (captured 26 September 2026)

    Charleston, SC · Operator names this city; no street published

    Operator’s facility code CHS01

    Critical IT: 0.1 MW. Scope facility · current or planned not stated. Critical IT capacity as stated for this facility. Not utility power, generation, or measured load. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Source figure: 100 kW; converted to 0.1 MW. Open the operator’s page → Captured 26 September 2026.

    Utility power: 1.3 MW. Scope facility · current or planned not stated. Utility power as stated for this facility. Not critical IT capacity or measured load. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 26 September 2026.

    Raised-floor or white-space area: 15,000 square feet. Scope facility · current or planned not stated. Raised-floor or white-space area as stated for this facility. Not the total floor area of the building or campus. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 26 September 2026.

    FacilityLifecycle status is not published for this listing
    dcd-op-000100
  2. DartPoints Columbia Data Center (CAE01)

    Listed by DartPoints on its website (captured 26 September 2026)

    Columbia, SC · Operator names this city; no street published

    Operator’s facility code CAE01

    Critical IT: 0.11 MW. Scope facility · current or planned not stated. Critical IT capacity as stated for this facility. Not utility power, generation, or measured load. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Source figure: 110 kW; converted to 0.11 MW. Open the operator’s page → Captured 26 September 2026.

    Utility power: 2 MW. Scope facility · current or planned not stated. Utility power as stated for this facility. Not critical IT capacity or measured load. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 26 September 2026.

    Raised-floor or white-space area: 15,000 square feet. Scope facility · current or planned not stated. Raised-floor or white-space area as stated for this facility. Not the total floor area of the building or campus. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 26 September 2026.

    FacilityLifecycle status is not published for this listing
    dcd-op-000099
  3. DartPoints Spartanburg Data Center (SPA01)

    Listed by DartPoints on its website (captured 26 September 2026)

    Spartanburg, SC · Operator names this city; no street published

    Operator’s facility code SPA01

    Critical IT: 0.8 MW. Scope facility · current or planned not stated. Critical IT capacity as stated for this facility. Not utility power, generation, or measured load. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 26 September 2026.

    Utility power: 1.6 MW. Scope facility · current or planned not stated. Utility power as stated for this facility. Not critical IT capacity or measured load. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 26 September 2026.

    Raised-floor or white-space area: 21,400 square feet. Scope facility · current or planned not stated. Raised-floor or white-space area as stated for this facility. Not the total floor area of the building or campus. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 26 September 2026.

    FacilityLifecycle status is not published for this listing
    dcd-op-000101
  4. Moncks Corner, SC Data Center

    Listed by Atmosphere Data Centers on its website (captured 6 October 2026)

    Moncks Corner, SC · Operator names this city; no street published

    Status on the operator’s page: planned. Normalized from the operator’s own wording; not independently verified. Open the operator’s page → Captured 6 October 2026.

    FacilityStatus on the operator’s page: planned
    dcd-op-000577
  5. Myrtle Beach CLS

    Listed by DC BLOX on its website (captured 27 September 2026)

    1401 Howard Road, Myrtle Beach, SC 29577

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000311
Source and reuse

Facts compiled by DataCenterData from operators’ public pages, each with the operator-page link and capture date; no page text is republished and no license is granted. How this layer was collected →