Nevada operator-listed data center sites

2 operator-listed sites (mixed units; not added to licensed rows) in Nevada, as listed by operators on their own websites. Not independently verified and not a census.

2 operator-listed sites (mixed units; not added to licensed rows)0 with a published street and their own page
Read this before using the list.

Each site is what an operator states about itself on its own website, checked against the page DataCenterData captured; each fact links to that page. DataCenterData has not verified these sites independently. The list is not a census: it covers only the operators whose official U.S. portfolio pages could be captured with their robots rules respected. Units are mixed (buildings, facilities, campuses and provider presences where a suite or floor is listed), so the numbers are not building counts, and they are never added to licensed rows or reviewed records.

Showing all 2 operator-listed sites in Nevada, sorted by name.

  1. RNO01

    Listed by Colovore on its website (captured 28 September 2026)

    Sparks, NV · Operator names this city; no street published

    Operator’s facility code RNO01

    Total power capacity: 6 MW. Scope building · stated as current. Total power capacity as stated for this building. Not critical IT capacity, not utility supply, and not measured load. The source describes this as the current figure. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 28 September 2026.

    Open the operator’s page (1) → captured 28 September 2026
    Open the operator’s page (2) → captured 28 September 2026

    CampusLifecycle status is not published for this listing
    dcd-op-000391
  2. RNO02

    Listed by Colovore on its website (captured 28 September 2026)

    Reno, NV · Operator names this city; no street published

    Operator’s facility code RNO02

    Status on the operator’s page: under construction. Normalized from the operator’s own wording; not independently verified. Open the operator’s page → Captured 28 September 2026.

    Total power capacity: 16 MW. Scope facility · stated as planned. Total power capacity as stated for this facility. Not critical IT capacity, not utility supply, and not measured load. The source describes this as planned, not a measured live figure. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 28 September 2026.

    FacilityStatus on the operator’s page: under construction
    dcd-op-000392
Source and reuse

Facts compiled by DataCenterData from operators’ public pages, each with the operator-page link and capture date; no page text is republished and no license is granted. How this layer was collected →