Operator-listed layer · California · not independently verified

California operator-listed data center sites

58 operator-listed sites (mixed units; not added to licensed rows) in California, as listed by operators on their own websites. Not independently verified and not a census.

58 operator-listed sites (mixed units; not added to licensed rows)33 with a published street and their own page
Read this before using the list.

Each site is what an operator states about itself on its own website, checked against the page DataCenterData captured; each fact links to that page. DataCenterData has not verified these sites independently. The list is not a census: it covers only the operators whose official U.S. portfolio pages could be captured with their robots rules respected. Units are mixed (buildings, facilities, campuses and provider presences where a suite or floor is listed), so the numbers are not building counts, and they are never added to licensed rows or reviewed records.

Showing all 58 operator-listed sites in California, sorted by name.

  1. 365 Data Centers’ Rancho Cordova Data Center

    Listed by 365 Data Centers on its website (captured 25 September 2026)

    11085 Sun Center Drive, Rancho Cordova, CA 95670

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000004
  2. Building 451

    Listed by Lawrence Livermore National Laboratory on its website (captured 5 October 2026)

    Livermore, CA · Operator names this city; no street published

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page → captured 5 October 2026

    BuildingLifecycle status is not published for this listing
    dcd-op-000531
  3. Building 453

    Listed by Lawrence Livermore National Laboratory on its website (captured 5 October 2026)

    Livermore, CA · Operator names this city; no street published

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page → captured 5 October 2026

    BuildingLifecycle status is not published for this listing
    dcd-op-000532
  4. Building 654

    Listed by Lawrence Livermore National Laboratory on its website (captured 5 October 2026)

    Livermore, CA · Operator names this city; no street published

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page → captured 5 October 2026

    BuildingLifecycle status is not published for this listing
    dcd-op-000533
  5. Burbank, CA

    Listed by Serverfarm on its website (captured 29 September 2026)

    Burbank, CA · Operator names this city; no street published

    Status on the operator’s page: planned. Normalized from the operator’s own wording; not independently verified. Open the operator’s page → Captured 29 September 2026.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityStatus on the operator’s page: planned
    dcd-op-000671
  6. CoreSite LA3

    Listed by CoreSite on its website (captured 3 October 2026)

    200 Bauchet Street, Los Angeles, CA

    BuildingLifecycle status is not published for this listing
    View listing →dcd-op-000525
  7. CoreSite SV2

    Listed by CoreSite on its website (captured 25 September 2026)

    1656 McCarthy Blvd., Milpitas, CA 95035

    BuildingLifecycle status is not published for this listing
    View listing →dcd-op-000070
  8. CoreSite SV4

    Listed by CoreSite on its website (captured 3 October 2026)

    2972 Stender Way, Santa Clara, CA

    BuildingLifecycle status is not published for this listing
    View listing →dcd-op-000527
  9. CoreSite SV7

    Listed by CoreSite on its website (captured 25 September 2026)

    3020 Coronado Drive, Santa Clara, CA 95054

    BuildingLifecycle status is not published for this listing
    View listing →dcd-op-000071
  10. CoreSite SV8

    Listed by CoreSite on its website (captured 3 October 2026)

    3035 Stender Way, Santa Clara, CA

    BuildingLifecycle status is not published for this listing
    View listing →dcd-op-000528
  11. CoreSite SV9

    Listed by CoreSite on its website (captured 3 October 2026)

    2915 Stender Way, Santa Clara, CA 95054

    BuildingLifecycle status is not published for this listing
    View listing →dcd-op-000526
  12. Cruzio Colocation

    Listed by Cruzio on its website (captured 14 October 2026)

    Santa Cruz, CA · Operator names this city; no street published

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page → captured 14 October 2026

    FacilityLifecycle status is not published for this listing
    dcd-op-000634
  13. Data Center West, Redding California

    Listed by Data Center West on its website (captured 14 October 2026)

    Redding, CA · Operator names this city; no street published

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page (1) → captured 14 October 2026
    Open the operator’s page (2) → captured 14 October 2026

    FacilityLifecycle status is not published for this listing
    dcd-op-000637
  14. EdgeConneX SVC01

    Listed by EdgeConneX on its website (captured 25 September 2026)

    Santa Clara, CA · Operator names this city; no street published

    Operator’s facility code SVC01

    Floor area: 19,800 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Raised-floor or white-space area: 11,700 square feet. Scope facility · current or planned not stated. Raised-floor or white-space area as stated for this facility. Not the total floor area of the building or campus. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Cooling design reported by the operator: N+1 redundancy. Scope facility · design rating as stated. Cooling design redundancy as the operator states it for this facility. Not cooling technology, capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    EdgeConneX · SVC01 — Additional operator-reported details

    • Carrier neutrality: Company states the site is carrier-neutral facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Rack density: At least 20 kW per rack facility scope

      Company-reported. Not independently verified.

      Design maximum as stated by the operator. Not comparable across records.

      Open cited source → Captured 2026-09-25.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000158
  15. Equinix LA3 (LAX1)

    Listed by InterServer on its website (captured 28 September 2026)

    Los Angeles, CA · Operator names this city; no street published

    Operator’s facility code LAX1

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page (1) → captured 28 September 2026
    Open the operator’s page (2) → captured 28 September 2026

    Provider presence (suite or floor listed)Lifecycle status is not published for this listing
    dcd-op-000448
  16. I2B Networks

    Listed by i2b Networks on its website (captured 28 September 2026)

    San Diego, CA · Operator names this city; no street published

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page (1) → captured 28 September 2026
    Open the operator’s page (2) → captured 28 September 2026
    Open the operator’s page (3) → captured 28 September 2026

    FacilityLifecycle status is not published for this listing
    dcd-op-000443
  17. La Mirada Office & Data Center

    Listed by Cogent Communications on its website (captured 25 September 2026)

    16680 Valley View Ave, La Mirada, CA 90638

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000031
  18. Los Angeles (extension) Data Center

    Listed by NetActuate on its website (captured 28 September 2026)

    Los Angeles, CA · Operator names this city; no street published

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page → captured 28 September 2026

    Provider presence (suite or floor listed)Lifecycle status is not published for this listing
    dcd-op-000399
  19. Los Angeles (LAX1) Data Center

    Listed by Hivelocity on its website (captured 25 September 2026)

    Los Angeles, CA · Operator names this city; no street published

    Operator’s facility code LAX1

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page → captured 25 September 2026

    FacilityLifecycle status is not published for this listing
    dcd-op-000201
  20. Los Angeles 2 / LAX2 Colo Data Center

    Listed by Hivelocity on its website (captured 25 September 2026)

    600 West 7th St., Los Angeles, CA 90017

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000203
  21. Los Angeles BUR10

    Listed by Digital Realty on its website (captured 25 September 2026)

    3015 Winona Avenue, Burbank, CA 91504

    BuildingLifecycle status is not published for this listing
    View listing →dcd-op-000132
  22. Los Angeles Data Center

    Listed by Cogent Communications on its website (captured 25 September 2026)

    530 West 6th Street, 10th Floor, Los Angeles, CA 90014

    Provider presence (suite or floor listed)Lifecycle status is not published for this listing
    View listing →dcd-op-000035
  23. Los Angeles Data Center

    Listed by Telehouse America (KDDI) on its website (captured 5 October 2026)

    626 Wilshire Boulevard, Los Angeles, CA 90017

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000546
  24. Los Angeles Data Center (LAX2)

    Listed by Evocative on its website (captured 25 September 2026)

    Los Angeles, CA · Operator names this city; no street published

    Operator’s facility code LAX2

    Floor area: 30,000 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Evocative · LAX2 — Additional operator-reported details

    Company-level claims — not verified for this facility.
    • Certification or compliance claim: Company states HIPAA compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states PCI DSS compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SOC 2 Type II attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SOC 3 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states ISAE 3402 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SSAE 18 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000176
  25. Los Angeles LAX11

    Listed by Digital Realty on its website (captured 25 September 2026)

    200 North Nash Street, El Segundo, CA 90245

    BuildingLifecycle status is not published for this listing
    View listing →dcd-op-000131
  26. Palm Springs Data Center

    Listed by Cogent Communications on its website (captured 25 September 2026)

    3601 N Indian Canyon Drive, Palm Springs, CA 92262

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000034
  27. Pasadena Office & Data Center

    Listed by Cogent Communications on its website (captured 25 September 2026)

    2947 Bradley St, Ste 100, 1st Floor, Pasadena, CA 91107

    Provider presence (suite or floor listed)Lifecycle status is not published for this listing
    View listing →dcd-op-000033
  28. Redondo Beach Data Center (LAX14)

    Listed by Evocative on its website (captured 25 September 2026)

    Redondo Beach, CA · Operator names this city; no street published

    Operator’s facility code LAX14

    Floor area: 104,000 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Raised-floor or white-space area: 24,345 square feet. Scope facility · current or planned not stated. Raised-floor or white-space area as stated for this facility. Not the total floor area of the building or campus. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Cooling design reported by the operator: N+1 redundancy. Scope facility · design rating as stated. Cooling design redundancy as the operator states it for this facility. Not cooling technology, capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Generator redundancy: N+1 redundancy. Scope facility · design rating as stated. Backup-generator redundancy as the operator states it for this facility. Not generator capacity, fuel or permitted output. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Evocative · LAX14 — Additional operator-reported details

    • Carrier neutrality: Company states the site is carrier-neutral facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    Company-level claims — not verified for this facility.
    • Certification or compliance claim: Company states HIPAA compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states PCI DSS compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SOC 2 Type II attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SOC 3 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states ISAE 3402 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SSAE 18 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000175
  29. Rialto Data Center

    Listed by Cogent Communications on its website (captured 25 September 2026)

    282 South Sycamore Ave, Rialto, CA 92376

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000032
  30. San Diego Data Center #1

    Listed by LightEdge on its website (captured 26 September 2026)

    9305 Lightwave Ave, San Diego, CA 92123

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000288
  31. San Diego Data Center #2

    Listed by LightEdge on its website (captured 26 September 2026)

    9725 Scranton Road, San Diego, CA 92121

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000289
  32. San Diego Office & Data Center

    Listed by Cogent Communications on its website (captured 25 September 2026)

    1402 K St, San Diego, CA 92101

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000030
  33. San Diego Supercomputer Center

    Listed by San Diego Supercomputer Center on its website (captured 5 October 2026)

    La Jolla, CA · Operator names this city; no street published

    Floor area: 19,000 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 5 October 2026.

    San Diego Supercomputer Center · San Diego Supercomputer Center — Additional operator-reported details

    • Service: Cabinets facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-10-05.
    • Service: Remote hands facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-10-05.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000538
  34. San Jose (SJC1) Data Center

    Listed by Hivelocity on its website (captured 25 September 2026)

    San Jose, CA · Operator names this city; no street published

    Operator’s facility code SJC1

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page → captured 25 September 2026

    FacilityLifecycle status is not published for this listing
    dcd-op-000202
  35. San Jose (SJC2)

    Listed by Rackspace Technology on its website (captured 28 September 2026)

    San Jose, CA · Operator names this city; no street published

    Operator’s facility code SJC2

    UPS design redundancy: N+2 redundancy. Scope facility · design rating as stated. UPS design redundancy as the operator states it for this facility. Not battery runtime, UPS capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 28 September 2026.

    Rackspace Technology · SJC2 — Additional operator-reported details

    • Carrier neutrality: Company states the site is carrier-neutral facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-28.
    • Specifications and facility pages: San Jose Data Center (SJC2) | Rackspace Technology — https://www.rackspace.com/about/data-centers/san-jose facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-28.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000412
  36. San Jose Data Center

    Listed by LightEdge on its website (captured 26 September 2026)

    7 Great Oaks Boulevard, San Jose, CA 95119

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000287
  37. San Jose Data Center (SJC7)

    Listed by Evocative on its website (captured 25 September 2026)

    San Jose, CA · Operator names this city; no street published

    Operator’s facility code SJC7

    Floor area: 21,000 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Cooling design reported by the operator: N+1 redundancy. Scope facility · design rating as stated. Cooling design redundancy as the operator states it for this facility. Not cooling technology, capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Evocative · SJC7 — Additional operator-reported details

    • Network presence: Cogent Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Zayo Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Lumen Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Verizon Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: AT&T Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Bandwidth IG Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Boldyn Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    Company-level claims — not verified for this facility.
    • Certification or compliance claim: Company states HIPAA compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states PCI DSS compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SOC 2 Type II attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SOC 3 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states ISAE 3402 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SSAE 18 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000180
  38. San Jose, California data center

    Listed by Liquid Web on its website (captured 27 September 2026)

    San Jose, CA · Operator names this city; no street published

    Floor area: 55,000 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 27 September 2026.

    Liquid Web · San Jose, California data center — Additional operator-reported details

    • Network presence: Packet Fabric Interconnection fabric · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-27.
    • Carrier neutrality: Company states the site is carrier-neutral facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-27.
    • Certification or compliance claim: Company states PCI-DSS audit Audit · facility scope

      Company-reported. Not independently verified.

      A company statement. No issuer record confirming it for this site is recorded here.

      Open cited source → Captured 2026-09-27.
    • Certification or compliance claim: Company states SOC 1-3 audit Audit · facility scope

      Company-reported. Not independently verified.

      A company statement. No issuer record confirming it for this site is recorded here.

      Open cited source → Captured 2026-09-27.
    • Certification or compliance claim: Company states SSAE-18 attestation Attestation · facility scope

      Company-reported. Not independently verified.

      A company statement. No issuer record confirming it for this site is recorded here.

      Open cited source → Captured 2026-09-27.
    Company-level claims — not verified for this facility.
    • Business contact: Main line: 800.580.4985 company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility.

      Open cited source → Captured 2026-09-27.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000363
  39. San Luis Obispo Data Center

    Listed by H5 Data Centers on its website (captured 25 September 2026)

    3610 Sacramento Drive, San Luis Obispo, CA 93401

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000191
  40. Santa Clara Data Center (SJC11)

    Listed by Evocative on its website (captured 25 September 2026)

    Santa Clara, CA · Operator names this city; no street published

    Operator’s facility code SJC11

    Floor area: 73,000 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    UPS design redundancy: N+1 redundancy. Scope facility · design rating as stated. UPS design redundancy as the operator states it for this facility. Not battery runtime, UPS capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Evocative · SJC11 — Additional operator-reported details

    • Network presence: AT&T Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Bandwidth IG Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Lumen Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Cogent Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Comcast Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Spectrum Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Verizon Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Zayo Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    Company-level claims — not verified for this facility.
    • Certification or compliance claim: Company states HIPAA compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states PCI DSS compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SOC 3 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states ISAE 3402 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SSAE 18 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000177
  41. Santa Clara Data Center (SJC14)

    Listed by Evocative on its website (captured 25 September 2026)

    Santa Clara, CA · Operator names this city; no street published

    Operator’s facility code SJC14

    Floor area: 14,800 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Cooling design reported by the operator: N+2 redundancy. Scope facility · design rating as stated. Cooling design redundancy as the operator states it for this facility. Not cooling technology, capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    UPS design redundancy: N+1 redundancy. Scope facility · design rating as stated. UPS design redundancy as the operator states it for this facility. Not battery runtime, UPS capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Evocative · SJC14 — Additional operator-reported details

    • Network presence: Lumen Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: AT&T Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Zayo Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Cogent Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Verizon Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Bandwidth IG Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    Company-level claims — not verified for this facility.
    • Certification or compliance claim: Company states HIPAA compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states PCI-DSS compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SOC 2 Type II attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SOC 3 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states ISAE 3402 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SSAE 18 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000178
  42. Santa Clara Data Center (SJC3)

    Listed by Evocative on its website (captured 25 September 2026)

    Santa Clara, CA · Operator names this city; no street published

    Operator’s facility code SJC3

    Floor area: 15,000 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Evocative · SJC3 — Additional operator-reported details

    • Network presence: Lumen Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: AT&T Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Zayo Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Cogent Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Verizon Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Astound Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Bandwidth IG Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    • Network presence: Comcast Carrier · facility scope

      Company-reported. Not independently verified.

      Open cited source → Captured 2026-09-25.
    Company-level claims — not verified for this facility.
    • Certification or compliance claim: Company states HIPAA compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states PCI DSS compliance Compliance statement · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SOC 2 Type II attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SOC 3 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states ISAE 3402 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.
    • Certification or compliance claim: Company states SSAE 18 attestation Attestation · company scope

      Company-reported. Not independently verified.

      A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-18; this is not the source capture date and not a validity period.

      Open cited source → Captured 2026-09-25.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000179
  43. Santa Clara II

    Listed by Stream Data Centers on its website (captured 27 September 2026)

    3080 Raymond Street, Santa Clara, CA

    BuildingLifecycle status is not published for this listing
    View listing →dcd-op-000316
  44. Santa Clara III

    Listed by Stream Data Centers on its website (captured 27 September 2026)

    3075 Raymond Street, Santa Clara, CA 95054

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000315
  45. Santa Clara IV

    Listed by Stream Data Centers on its website (captured 27 September 2026)

    870 Duane, Santa Clara, CA 95054

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000317
  46. Santa Clara VI

    Listed by Stream Data Centers on its website (captured 27 September 2026)

    3011 Lafayette, Santa Clara, CA 95054

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000314
  47. Santa Clara, CA

    Listed by Serverfarm on its website (captured 29 September 2026)

    Santa Clara, CA · Operator names this city; no street published

    Status on the operator’s page: planned. Normalized from the operator’s own wording; not independently verified. Open the operator’s page → Captured 29 September 2026.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityStatus on the operator’s page: planned
    dcd-op-000672
  48. Shyh Wang Hall

    Listed by Lawrence Berkeley National Laboratory on its website (captured 8 October 2026)

    Berkeley, CA · Operator names this city; no street published

    Opened: 2015. Scope building · stated year. Opening year as the operator states it for this building. A stated opening year does not establish current operation, the current configuration, or an independently verified date. Open the operator’s page → Captured 8 October 2026.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page → captured 8 October 2026

    BuildingLifecycle status is not published for this listing
    dcd-op-000586
  49. Silicon Valley Data Center

    Listed by DataBank on its website (captured 25 September 2026)

    5101 Lafayette Street, Santa Clara, CA 95054

    BuildingLifecycle status is not published for this listing
    View listing →dcd-op-000102
  50. Silicon Valley Data Center

    Listed by H5 Data Centers on its website (captured 25 September 2026)

    1360 Kifer Rd, Sunnyvale, CA 94086

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000190
  51. SJC Campus

    Listed by CloudHQ on its website (captured 25 September 2026)

    Santa Clara, CA · Operator names this city; no street published

    Operator’s facility code SJC

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page → captured 25 September 2026

    CampusLifecycle status is not published for this listing
    dcd-op-000026
  52. SJC02

    Listed by Colovore on its website (captured 5 October 2026)

    3060 Raymond Street, Santa Clara, CA

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000540
  53. SJC15

    Listed by Digital Realty on its website (captured 29 September 2026)

    1201 Comstock Street, Santa Clara, CA 95054

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000493
  54. SJC29

    Listed by Digital Realty on its website (captured 29 September 2026)

    1725 Comstock Street, Santa Clara, CA 95054

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000489
  55. SJC35

    Listed by Digital Realty on its website (captured 29 September 2026)

    3205 Alfred Street, Santa Clara, CA 95054

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000494
  56. Stanford Research Computing Facility

    Listed by Stanford University on its website (captured 6 October 2026)

    Menlo Park, CA · Operator names this city; no street published

    Operator’s facility code SRCF

    Opened: 2013. Scope facility · stated year. Opening year as the operator states it for this facility. A stated opening year does not establish current operation, the current configuration, or an independently verified date. Open the operator’s page → Captured 6 October 2026.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    Open the operator’s page → captured 6 October 2026

    FacilityLifecycle status is not published for this listing
    dcd-op-000591
  57. Sunnyvale Data Center

    Listed by Menlo Digital on its website (captured 5 October 2026)

    444 Toyama Drive, Sunnyvale, CA

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000541
  58. US – West (Silicon Valley)

    Listed by HorizonIQ on its website (captured 26 September 2026)

    2151 Mission College Boulevard, Santa Clara, CA 95054

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000284
Source and reuse

Facts compiled by DataCenterData from operators’ public pages, each with the operator-page link and capture date; no page text is republished and no license is granted. How this layer was collected →