This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Google Midlothian Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Address and locality
- Midlothian · Ellis County · Texas
- Official metro area
- Dallas-Fort Worth-Arlington, TX
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 14 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001866
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 375 acres (source-reported; parcel boundary not established)
- Announced
- 14 June 2019
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Ellis County 10-year tax abatement (100% personal property, 85% improvements) · Ellis County, TX · 2018 Open cited source →
What the source record says
On 375 acres in RailPort Business Park, bought in May 2017 through Sharka LLC. The abatement requires at least $500M invested and 40 full-time jobs by year five. Distinct from the tracked Google Red Oak campus. Coordinates are as listed by Baxtel.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2019-06-14 · source-reported operational
Launch event in June 2019 with $600M invested in the site.
- 2026-10-14 · source-reported operational
Three buildings operational (2019, 2020, 2025) and two more under construction for 2027.
Sources and attribution
- Google Boosts its Texas Investments With a New $600M Midlothian Data Center · Dallas Innovates
- Google: Midlothian Campus · Baxtel
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID google-midlothian-ellis-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001866
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Midlothian, TX · Ellis (Approximate location)
Roles
- Operator: Google
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 14 June 2019
Provider-reported announcement date.
- Status history: 2019-06-14 · source-reported operational
Status history supplied by the source.
- Status history: 2026-10-14 · source-reported operational
Status history supplied by the source.
Area, acreage and buildings
- Land area: 375 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Incentive reported by the source: Ellis County 10-year tax abatement (100% personal property, 85% improvements) · Ellis County, TX · 2018
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.