Licensed lead · not independently verified · dcd-dir-001582

Wise Innovation Hub (OASIS)

source-reported proposed

Wise Innovation Hub Venture LLC

Wise County · Virginia

Capacity not established; source review excludes the published figureSource updated 14 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Wise Innovation Hub (OASIS).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Wise Innovation Hub Venture LLC
Address and locality
Wise County · Virginia
Official metro area
Outside an official metropolitan boundary
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
14 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001582
Capacity held out of the public projection.

The source note states that compute capacity has not been disclosed. The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power supply description
Red Post Energy Group (Maverick Project)Provider’s own description of the power supply; no separate utility field was supplied.
Power source
OtherProvider label.
On-site generation
600 MW (source-reported)On-site figures often describe backup generators rather than primary supply; read the provider energy note.
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
December 2025Provider-reported announcement date.

Provider notes

Energy. To be served by the phased Maverick Project (up to 600 MW; hydrogen preferred, natural gas fallback) developed by Red Post Energy Group.

Community. Appalachian Voices reports Wise County residents learned of the project in late 2025 through a LinkedIn post rather than official county channels and raised transparency concerns; as of early March 2026 no additional public information was available. Appalachian Voices opposes the gas approach and advocates renewables instead, citing the solar array serving the nearby Mineral Gap data center.

What the source record says

Phased technology/data-center hub planned over ~10 years at the Lonesome Pine Regional Business & Technology Park (adjacent to Lonesome Pine Regional Airport) on former mined land in Wise County — a multi-tenant cluster co-located with the existing Mineral Gap data center. Developer Wise Innovation Hub Venture LLC (branded 'OASIS') signed a 2025-12-18 LOI with Red Post Energy for dedicated power; compute capacity and named end-users not yet disclosed, so capacity is omitted.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-12-18 · source-reported proposed

    Wise Innovation Hub Venture executed an LOI with Red Post Energy Group for phased power infrastructure

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID wise-innovation-hub-wise-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001582

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • VA · Wise (Approximate location)

Roles

  • Operator: Wise Innovation Hub Venture LLC

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: December 2025

    Provider-reported announcement date.

  • Status history: 2025-12-18 · source-reported proposed

    Status history supplied by the source.

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power supply description: Red Post Energy Group (Maverick Project)

    Provider’s own description of the power supply; no separate utility field was supplied.

  • Power source: Other

    Provider label.

  • On-site generation: 600 MW (source-reported)

    On-site figures often describe backup generators rather than primary supply; read the provider energy note.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →