Licensed lead · not independently verified · dcd-dir-001582

Wise Innovation Hub (OASIS)

source-reported proposed

Wise Innovation Hub Venture LLC

Wise County · Virginia

Capacity not established; source review excludes the published figureSource updated 14 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Wise Innovation Hub (OASIS).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Wise Innovation Hub Venture LLC
Address and locality
Wise County · Virginia
Source-reported status
proposed
Facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
14 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001582
Capacity held out of the public projection.

The source note states that compute capacity has not been disclosed. The upstream row remains attributed below, but this value is not repeated as site capacity.

What the source record says

Phased technology/data-center hub planned over ~10 years at the Lonesome Pine Regional Business & Technology Park (adjacent to Lonesome Pine Regional Airport) on former mined land in Wise County — a multi-tenant cluster co-located with the existing Mineral Gap data center. Developer Wise Innovation Hub Venture LLC (branded 'OASIS') signed a 2025-12-18 LOI with Red Post Energy for dedicated power; compute capacity and named end-users not yet disclosed, so capacity is omitted.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-12-18 · source-reported proposed

    Wise Innovation Hub Venture executed an LOI with Red Post Energy Group for phased power infrastructure

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID wise-innovation-hub-wise-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →