Licensed lead · not independently verified · dcd-dir-001575

WhiteFiber NC-1 AI Data Center Campus

source-reported operational

WhiteFiber (Bit Digital)

Madison · Rockingham County · North Carolina

Reported planned 200 MWReported operational 24 MWSource updated 15 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for WhiteFiber NC-1 AI Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
WhiteFiber (Bit Digital)
Address and locality
Madison · Rockingham County · North Carolina
Official metro area
Greensboro-High Point, NC
Source-reported status
operational
Provider facility type
data center
Reported capacity
Operational: 24 MW; Planned: 200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
15 October 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001575

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Duke EnergyUtility as named by the provider.
Power source
GridProvider label.
Land area
96 acres (source-reported; parcel boundary not established)
Announced jobs
60 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • North Carolina sales & use tax exemption for qualifying data centers (G.S. 105-164.13(55a)) - facility confirmed as a qualifying data center; no dollar value disclosed · North Carolina · 2025 Open cited source →

Provider notes

Energy. 99 MW power agreement with Duke Energy (24 MW targeted for delivery ~Sept 1, 2025), scalable to 200 MW over time.

Community. Officials welcomed the project at the June 2025 announcement (Governor, Rockingham County commissioners, Madison mayor); the site is a converted former Unifi textile plant (brownfield reuse). No documented opposition found.

What the source record says

Operator is WhiteFiber (Bit Digital's AI unit); Nscale is the 40 MW anchor tenant (10-year, ~$865M total contract value = revenue, not capex — in notes). ~1M sq ft, up to 150 kW/cabinet, 99 MW secured from Duke Energy, 200 MW eventual site potential (planned figure). $150M WhiteFiber equity. Madison is in Rockingham County, NC. Coordinates are the Madison town centroid. Property acquired for $45M (2025, from Unifi); the total buildout described as 'over $1B' is conditional on reaching 200 MW -> investmentUsd omitted. ~60 permanent jobs (~$67k avg) were pledged (Rockingham County) - a commitment, with the facility still under construction -> jobs honest-zero. Cooling type not publicly disclosed -> water honest-zero.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · source-reported under construction

    WhiteFiber (Bit Digital's AI unit) acquired a ~1M sq ft NC industrial property for an AI/HPC campus; Nscale signed a 10-year, 40 MW anchor colocation (~$865M TCV)

    Open cited source →

  2. 2026-08-15 · source-reported operational

    WhiteFiber's Q2 2026 results report that NC-1 has moved from construction into customer deployment: initial capacity has been delivered, equipment startup and customer testing are underway, initial billing has commenced, and full contracted run-rate billing across the 40 MW of contracted IT load was expected during August 2026.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID whitefiber-nc1-madison-nc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001575

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Madison, NC · Rockingham (Approximate location)

Roles

  • Operator: WhiteFiber (Bit Digital)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2025

    Provider-reported announcement date.

  • Status history: 2025 · source-reported under construction

    Status history supplied by the source.

  • Status history: 2026-08-15 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 96 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Operational: 24 MW; Planned: 200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Duke Energy

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced jobs: 60 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: North Carolina sales & use tax exemption for qualifying data centers (G.S. 105-164.13(55a)) - facility confirmed as a qualifying data center; no dollar value disclosed · North Carolina · 2025

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-15

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →