Licensed lead · not independently verified · dcd-dir-001554

Project Alpaca (Midway Green Industrial Park)

source-reported proposed

Volt Edge Energy

265 Midway Drive · Union · Union County · South Carolina

Reported planned 49 MWSource updated 22 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Project Alpaca (Midway Green Industrial Park).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Volt Edge Energy
Address and locality
265 Midway Drive · Union · Union County · South Carolina
Official metro area
Spartanburg, SC
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 49 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
22 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001554

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Announced investment
$410 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
50 permanent · 500 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Community. Union County Council tabled the first reading of the FILOT ordinance for Project Alpaca on 2026-04-28 and cancelled a May 12, 2026 public hearing after resident concerns raised at a community listening session; council said the project would need to be reintroduced, with a public information forum required before any further tax-agreement decision.

What the source record says

Site address per the Union County Development Board's own park page is 265 Midway Drive, Union, SC 29379 (a secondary source gave 260 Midway Drive; the two geocode ~40m apart, consistent with the same industrial park). Coordinates geocoded from that street address via the US Census geocoder — not stated as facility coordinates by any source, and the industrial park spans multiple parcels so the specific building footprint is unconfirmed. No source names an AI-specific workload for this site, so aiClassification is omitted.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID volt-edge-project-alpaca-union-county-sc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001554

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 265 Midway Drive, Union, SC (Approximate location)

Roles

  • Operator: Volt Edge Energy

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

Power capacity

  • Reported capacity: Planned: 49 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Announced investment: $410 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 50 permanent · 500 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-22

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →