Licensed lead · not independently verified · dcd-dir-001500

Treetop East Fishkill Data Center (proposed, no application filed)

source-reported proposed

Treetop Development

East Fishkill · Dutchess County · New York

Reported planned 1,000 MWSource updated 9 September 2026approximate location · provider confidence label: rumored
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Treetop East Fishkill Data Center (proposed, no application filed).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Treetop Development
Address and locality
East Fishkill · Dutchess County · New York
Official metro area
Kiryas Joel-Poughkeepsie-Newburgh, NY
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
9 September 2026
Location precision
approximate
Compute Atlas confidence label
rumored (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001500

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

Provider notes

Community. The East Fishkill Town Board "voted unanimously to pass" a three-year moratorium on data centers on June 25, 2026, following organised resident opposition; advocacy groups have used the fight to campaign for a statewide Responsible Data Center Development Act.

What the source record says

⚠️ LOW-CERTAINTY BY CONSTRUCTION - included because a 1,000 MW load is the largest proposed in New York found in this run, and excluded fields say why. confidence is 'rumored' and status 'proposed' rather than 'cancelled': the town supervisor confirmed on May 11, 2025 that "no site plan, special permit application, zoning request, or other development application has been submitted to the town for review," and the developer "has never submitted a formal application for the project nor a site plan" - yet the project was still described as under evaluation in the NYISO process when the town passed its moratorium on June 25, 2026, so it is not affirmatively dead either. Teaneck, NJ-based Treetop Development is evaluating converting land currently planned for "a 1,161,515 SF warehouse" (scaled down to 765,000 square feet in other reporting) into "a 1,000-megawatt (1-gigawatt) data center." capacityMw.planned = 1000 is that stated figure, unconverted. Confirmed absences (2026-09-09): NEITHER fetched source gives a street, parcel, acreage, square footage for the data center itself, investment, job count, water figure, utility, or subsidy agreement; secondary reporting places the site "off of I-84 and Lime Kiln Road" but that was NOT verified in a fetched source, so no street is recorded and coordinates are a TOWN-LEVEL placeholder for East Fishkill, Dutchess County. If the maintainer's bar is a filed application, this record should be dropped.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-05 · source-reported proposed

    Town Supervisor Nicholas D'Alessandro stated that "no site plan, special permit application, zoning request, or other development application has been submitted to the town for review."

    Open cited source →

  2. 2026-06 · source-reported proposed

    East Fishkill Town Board passed a three-year moratorium on data centers, June 25, 2026.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID treetop-east-fishkill-ny. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001500

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • East Fishkill, NY · Dutchess (Approximate location)

Roles

  • Operator: Treetop Development

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2025-05 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-06 · source-reported proposed

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-09

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →