This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Townsite Solar 2 Boulder City Data Center.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Townsite Solar 2 LLC
- Address and locality
- Boulder City · Clark County · Nevada
- Official metro area
- Las Vegas-Henderson-North Las Vegas, NV
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 167 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 11 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001482
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 88.5 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: opposed
- AI-use label (provider)
- likely
- Announced
- April 2026
Provider notes
Energy. Self-supplied through a dedicated project-funded 230 kV line from the Mead substation, completely separate from Boulder City's power distribution system, with on-site battery storage for peak management. Peak demand stated as 167 MW, under 2% of Mead substation capacity.
Water. Air-cooled closed-loop design. Potable water limited to restrooms and an employee kitchen, with roughly 90% of water used returning to the city wastewater treatment system.
Community. Public pushback in Boulder City preceded the applicant's withdrawal of its application for the city-owned parcel on July 6, 2026.
What the source record says
Proposed as two warehouse-style server buildings plus a 230 kV substation, battery energy storage and perimeter fencing, maximum 40-foot height with dark-sky-compliant lighting. The city page states 200-300 construction/testing jobs and 25-40 permanent technical positions; these ranges are not recorded as point values in the jobs field. Reported as a joint venture of Skylar Capital, Arevon Energy and Overwatch Capital, but that ownership was read only in a search summary and is not asserted here. Status is kept at proposed rather than cancelled: the withdrawal was of the city-land application, not of the project.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-07-06 · source-reported proposed
Townsite Solar 2 withdrew its application to build on approximately 88.5 acres of Boulder City-owned land; reporting indicates the developer intends to pursue a nearby federally owned parcel instead.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- TS2 Data Center Proposal (withdrawn 7.6.2026) - official Boulder City project page · City of Boulder City, Nevada
- Data centers in Nevada - project list (Townsite Solar 2 Boulder City Data Center, Clark County, 170 MW, planned) · Cleanview
- IBLA 2026-0213 / IBLA 2026-0216 stay order (Sept. 1, 2026) - City of Boulder City and Center for Biological Diversity v. BLM, Townsite Data Center amended right-of-way · U.S. Department of the Interior, Interior Board of Land Appeals
- Nevada city dubs itself a test case for data centers on federal lands near communities - 81-acre BLM parcel in Eldorado Valley, BLM approval released June 26 · KJZZ
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID townsite-solar-2-boulder-city-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row is retained from 1.33.0+git-e97215faac76, source as of 2026-09-25T23:45:52.227Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001482
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Boulder City, NV · Clark (Approximate location)
Roles
- Operator: Townsite Solar 2 LLC
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: April 2026
Provider-reported announcement date.
- Status history: 2026-07-06 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 88.5 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 167 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: opposed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-11
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.