Townsite Solar 2 Boulder City Data Center

source-reported proposed

Townsite Solar 2 LLC

Boulder City · Clark County · Nevada

Reported planned 167 MWSource updated 11 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Townsite Solar 2 Boulder City Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Townsite Solar 2 LLC
Address and locality
Boulder City · Clark County · Nevada
Official metro area
Las Vegas-Henderson-North Las Vegas, NV
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 167 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
11 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001482

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Land area
88.5 acres (source-reported; parcel boundary not established)
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
April 2026Provider-reported announcement date.

Provider notes

Energy. Self-supplied through a dedicated project-funded 230 kV line from the Mead substation, completely separate from Boulder City's power distribution system, with on-site battery storage for peak management. Peak demand stated as 167 MW, under 2% of Mead substation capacity.

Water. Air-cooled closed-loop design. Potable water limited to restrooms and an employee kitchen, with roughly 90% of water used returning to the city wastewater treatment system.

Community. Public pushback in Boulder City preceded the applicant's withdrawal of its application for the city-owned parcel on July 6, 2026.

What the source record says

Proposed as two warehouse-style server buildings plus a 230 kV substation, battery energy storage and perimeter fencing, maximum 40-foot height with dark-sky-compliant lighting. The city page states 200-300 construction/testing jobs and 25-40 permanent technical positions; these ranges are not recorded as point values in the jobs field. Reported as a joint venture of Skylar Capital, Arevon Energy and Overwatch Capital, but that ownership was read only in a search summary and is not asserted here. Status is kept at proposed rather than cancelled: the withdrawal was of the city-land application, not of the project.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-07-06 · source-reported proposed

    Townsite Solar 2 withdrew its application to build on approximately 88.5 acres of Boulder City-owned land; reporting indicates the developer intends to pursue a nearby federally owned parcel instead.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID townsite-solar-2-boulder-city-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row is retained from 1.33.0+git-e97215faac76, source as of 2026-09-25T23:45:52.227Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001482

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Boulder City, NV · Clark (Approximate location)

Roles

  • Operator: Townsite Solar 2 LLC

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: April 2026

    Provider-reported announcement date.

  • Status history: 2026-07-06 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 88.5 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 167 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-11

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →