Licensed lead · not independently verified · dcd-dir-001361

Howell Township Hyperscale Data Center

source-reported cancelled

Stantec Consulting Michigan / Randee LLC

Grand River Avenue, north of I-96 · Howell · Livingston County · Michigan

Capacity not statedSource updated 9 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Howell Township Hyperscale Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Stantec Consulting Michigan / Randee LLC
Address and locality
Grand River Avenue, north of I-96 · Howell · Livingston County · Michigan
Official metro area
Detroit-Warren-Dearborn, MI
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001361

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Land area
1,077 acres (source-reported; parcel boundary not established)
Announced investment
$1 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Community. The Howell Township Planning Commission voted against recommending the rezoning after a seven-hour meeting on 2025-09-23; the Livingston County Planning Commission voted against the project on 2025-11-19; the township board passed a six-month data-center moratorium on 2025-11-20. A grassroots residents' group organised specifically to stop the rezoning of the 1,077 acres on both sides of Grand River Avenue, citing energy, water, environmental and procedural concerns.

What the source record says

1,077 acres of largely agricultural land north of I-96 in Howell Township. Status 'cancelled' reflects the WITHDRAWN application, not confirmed abandonment — the source explicitly reports the developers may resubmit after the moratorium. END USER: Planet Detroit does NOT name the end user; the Gander Newsroom tracker labels the project 'Meta-linked developers' and other coverage has reported Meta as the hyperscaler behind it, but no source fetched in this run confirms Meta, so the operator field records only the named applicants (Stantec Consulting Michigan Inc. and Randee LLC). The landowner is the Van Gilder family. CONFIRMED ABSENCES: no megawatt capacity, water figure, or job count is stated in either source. Coordinates are Nominatim's match for Grand River Avenue in Howell Township, the road the source names as bisecting the site; the parcel boundary is not confirmed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-09 · source-reported proposed

    Planning commission voted against recommending the conditional rezoning.

    Open cited source →

  2. 2025-12 · source-reported cancelled

    Applicants withdrew the conditional rezoning request on 2025-12-08, saying they would honour the township's moratorium. Township officials indicated the developers may resubmit once the moratorium ends.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID stantec-randee-howell-township-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001361

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Grand River Avenue, north of I-96, Howell, MI · Livingston (Approximate location)

Roles

  • Operator: Stantec Consulting Michigan / Randee LLC

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2025-09 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-12 · source-reported cancelled

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 1,077 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Announced investment: $1 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-09

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →