Licensed lead · not independently verified · dcd-dir-001319

Silicon Foundation Warwood Data Center and Energy Campus (former Centre Foundry)

source-reported proposed

Silicon Foundation Energy

74 Warwood Avenue · Wheeling · Ohio County · West Virginia · 26003

Reported planned 100 MWSource updated 15 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Silicon Foundation Warwood Data Center and Energy Campus (former Centre Foundry).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Silicon Foundation Energy
Address and locality
74 Warwood Avenue · Wheeling · Ohio County · West Virginia · 26003
Official metro area
Wheeling, WV-OH
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
15 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001319

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
GridProvider label.
Cooling
Not establishedThe provider reports water information but no cooling type.
Land area
15 acres (source-reported; parcel boundary not established)
Announced
22 June 2026Provider-reported announcement date.

Provider notes

Energy. Phase 1 is described as 10 MW drawn from the existing grid through the site's existing electrical substation, paired with battery energy storage; the development plan also cites on-site gas infrastructure for backup power. Stokes Energy is named as the EPC contractor.

Water. West Virginia Public Broadcasting reports the development plan includes "access to river water for liquid cooling." No cooling method has been specified, so coolingType is left unset.

What the source record says

Phased plan: Phase 1 a 10-MW modular data center system with battery energy storage targeted for late 2026; Phase 2 expansion to 20–30 MW (reported as "as much as 100 megawatts" in 2027 by River News); Phase 3 a 100-MW regional compute hub. capacityMw.planned records the 100-MW full build-out. The foundry operated for more than 180 years until it closed in 2023. Under HB 2014 the project is exempt from county/municipal zoning and building permitting. Coordinates are the OSM address point for 74 Warwood Avenue, not a parcel-confirmed footprint.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-06-22 · source-reported proposed

    Silicon Foundation purchased the ~15-acre former Centre Foundry property at 74 Warwood Avenue and announced a phased data center and energy campus.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID silicon-foundation-warwood-wheeling-ohio-county-wv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001319

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 74 Warwood Avenue, Wheeling, WV 26003 · Ohio (Approximate location)

Roles

  • Operator: Silicon Foundation Energy

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 22 June 2026

    Provider-reported announcement date.

  • Status history: 2026-06-22 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 15 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-15

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →