This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for York Township Data Center (Platt Road / former Toyota land).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Sansone Group
- Address and locality
- York Township · Washtenaw County · Michigan
- Official metro area
- Ann Arbor, MI
- Source-reported status
- cancelled
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 14 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001293
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 412 acres (source-reported; parcel boundary not established)
What the source record says
Distinct from the tracked Sansone/Wixom Industrial One site on Wixom Road in Oakland County — this is a separate Washtenaw County parcel off Platt Road that Sansone pursued from Toyota. Coordinates are a township-level geocode.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-04-30 · source-reported cancelled
Sansone Group pulled out of its agreement to buy roughly 412 acres from Toyota along Platt Road after York Township refused to amend an existing development agreement that prohibits a data center on the site.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Land purchase for planned data center in York Township falls through · WEMU-FM
- How many AI data centers are planned in Michigan? We counted. · Gander Newsroom
- OpenStreetMap/Nominatim geocode for York Charter Township, Washtenaw County, Michigan (township-level pin) · OpenStreetMap
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID sansone-york-township-washtenaw-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001293
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- York Township, MI · Washtenaw (Approximate location)
Roles
- Operator: Sansone Group
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported cancelled
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026-04-30 · source-reported cancelled
Status history supplied by the source.
Area, acreage and buildings
- Land area: 412 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.