Licensed lead · not independently verified · dcd-dir-001292

Wixom Road Data Center Campus

source-reported proposed

Wixom Industrial One / Sansone Group

30625 S. Wixom Road · Wixom · Oakland County · Michigan

Capacity not statedSource updated 9 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Wixom Road Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Wixom Industrial One / Sansone Group
Address and locality
30625 S. Wixom Road · Wixom · Oakland County · Michigan
Official metro area
Detroit-Warren-Dearborn, MI
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001292

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Land area
55 acres (source-reported; parcel boundary not established)
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Community. City council unanimously rejected the developer's request to lift a data-center moratorium early, calling it 'unreasonable as it relates to the potential health, safety, and welfare impacts in the city.' The source reports that during roughly 90 minutes of public comment no speaker expressed support, with concerns centred on proximity to schools, day cares and homes. Developer Dennis Griffin said data centers were being treated 'very, very unfairly.'

What the source record says

Three-building complex, each building stated at more than 200,000 sq ft for a total of more than 519,000 sq ft, on vacant light-industrial land. Status is 'proposed' and remains blocked by the municipal moratorium — no site-plan or rezoning approval is recorded. Capacity: NO megawatt figure is stated in either source; capacityMw is therefore omitted rather than inferred from square footage. Water use is not quantified in the sources. Investment figure not stated. The source notes the site sits near a DTE Energy transmission line with natural gas service available, but no interconnection or generation arrangement is described, so energy is left unset. Coordinates from the US Census geocoder for the street address named in the source; parcel boundary not confirmed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-03 · source-reported proposed

    Wixom enacted a six-month data-center moratorium running through August 2026.

    Open cited source →

  2. 2026-07 · source-reported proposed

    City council unanimously voted down the developer's application to lift the moratorium early; a separate ordinance setting future data-center rules was postponed.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID sansone-wixom-road-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001292

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 30625 S. Wixom Road, Wixom, MI · Oakland (Approximate location)

Roles

  • Operator: Wixom Industrial One / Sansone Group

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-03 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-07 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 55 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-09

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →