Licensed lead · not independently verified · dcd-dir-001263

Roundhouse Cascade Locks Data Center

source-reported cancelled

Roundhouse Digital Infrastructure

1400 Columbia Gorge Way · Cascade Locks · Hood River County · Oregon

Reported planned 30 MWSource updated 5 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Roundhouse Cascade Locks Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Roundhouse Digital Infrastructure
Address and locality
1400 Columbia Gorge Way · Cascade Locks · Hood River County · Oregon
Official metro area
Outside an official metropolitan boundary
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Planned: 30 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
5 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001263

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Announced investment
$100 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Community. Local opposition — including the successful recall of two officials who had approved the deal — preceded the Port of Cascade Locks' decision to cancel, with concerns centred on utility rate increases.

What the source record says

Proposed $100 million, up-to-30 MW facility on land leased from the Port of Cascade Locks, cancelled in July 2023. Distinct from the tracked Abundant Mines crypto operation, which is a separate tenant at the same port. Coordinates are approximate (Port of Cascade Locks).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023-07 · source-reported cancelled

    The Port of Cascade Locks and Roundhouse jointly announced the project would be discontinued before construction.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID roundhouse-cascade-locks-or. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001263

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 1400 Columbia Gorge Way, Cascade Locks, OR · Hood River (Approximate location)

Roles

  • Operator: Roundhouse Digital Infrastructure

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2023-07 · source-reported cancelled

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 30 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Announced investment: $100 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-05

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →