Riverview Innovation & Technology Campus

source-reported proposed

Riverview Innovation & Technology Campus

Tonawanda · Erie County · New York

Reported planned 300 MWSource updated 21 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Riverview Innovation & Technology Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Riverview Innovation & Technology Campus
Address and locality
Tonawanda · Erie County · New York
Official metro area
Buffalo-Cheektowaga, NY
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
21 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001259

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
National GridUtility as named by the provider.
Power source
GridProvider label.
Cooling
Not establishedProvider label: unknown.
Land area
140 acres (source-reported; parcel boundary not established)
Announced investment
$2 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

Provider notes

Energy. Developer states ~91% emission-free electricity due to proximity to the Niagara Power Project (hydro) and Nine Mile Point Nuclear Station. SEQRA/site plan review temporarily paused while awaiting NYISO and National Grid clarification on transmission-upgrade costs/timeline. A $50M on-site electrical substation is planned.

Water. Community opposition specifically cited cooling-system noise (24/7 operation, cited by residents as 75-105+ decibels) as a top concern at the June 3, 2026 Planning Board meeting; specific cooling technology not yet disclosed by the developer.

Community. Hundreds of residents packed a June 3, 2026 Town of Tonawanda Planning Board meeting to oppose the project; concerns included cooling-system noise, comparisons to the Love Canal environmental disaster, and grid-strain concerns raised by Clean Air Coalition board chair Jim Jones. NY State Senator Jeremy Zellner (co-sponsor of a first-in-the-nation statewide data center moratorium bill) and Assemblyman Bill Conrad have both raised concerns publicly. Planning Board tabled further discussion pending a revised site plan application.

What the source record says

Site: former Tonawanda Coke Corporation coke-manufacturing plant (operated 1917-2018; TCC bankruptcy), 3875 & 3800 River Road, Town of Tonawanda, Erie County NY - 140 acres. Brownfield developer Jon M. Williams completed acquisition Oct. 10, 2019 and has led an estimated $100M remediation; Honeywell (successor to Allied Chemical/TCC predecessor) also involved. 500,000 sq ft facility proposed. Coordinates are approximate for the River Road parcel. Note: one source names 'Niagara County' but Buffalo News, BTPM, and WBEN independently and consistently identify this as the Town of Tonawanda, Erie County (distinct from the separate City of North Tonawanda in Niagara County) - Erie County used here per majority/independent-source cross-check. NO STATUS CHANGE. As of June 2026 the SEQRA/site-plan review was paused pending NYISO and National Grid results; no permit or construction approval exists. Remains proposed. CONFIRMED ABSENCE (re-checked 2026-09-10, reporting dated 2026-07): the Riverview project had not requested any IDA subsidy as of this reporting, and Erie County's executive has said he would not support the county IDA granting it tax breaks.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-06 · source-reported proposed

    Hundreds of residents packed a Town of Tonawanda Planning Board meeting on June 3, 2026 opposing the proposed 300MW data center at the former Tonawanda Coke site; the Planning Board voted to table further discussion pending a revised site plan application.

    Open cited source →

  2. 2026-07 · source-reported proposed

    Developer says the project is 'not on hold' but SEQRA/site plan review is temporarily paused while awaiting NYISO and National Grid clarification on transmission-upgrade costs and timeline; Town Supervisor John Flynn said NYISO's review could take 'several months.'

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID riverview-innovation-tech-campus-tonawanda-ny. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001259

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Tonawanda, NY · Erie (Approximate location)

Roles

  • Operator: Riverview Innovation & Technology Campus

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-06 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-07 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 140 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: National Grid

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    Provider label: unknown.

Permits, incentives, jobs and proceedings

  • Announced investment: $2 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →