This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Ranalli Lysander Data Center.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Ranalli
- Address and locality
- Lysander · Onondaga County · New York
- Official metro area
- Syracuse, NY
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 21 September 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- rumored (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001246
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- National Grid
- Power source
- Grid
- Land area
- 120 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: opposed
- AI-use label (provider)
- likely
Provider notes
Energy. Ranalli Super DC, LLC filed a NYISO grid-interconnection request in May 2025 for 300 MW; no on-site generation is described in the sources.
Community. Gov. Hochul's July 14, 2026 executive order imposes a one-year statewide freeze on hyperscale (>50MW) data-center permits and explicitly names the Lysander proposal as caught by it (its ~300MW interconnection request exceeds the threshold); this followed months of residents packing town meetings over electric demand.
What the source record says
Early-stage proposal on ~120 acres in Lysander, Onondaga County, with a grid interconnection request of up to 300 MW. Very early / single-source → confidence rumored. Coordinates are the Lysander area centroid. NO STATUS CHANGE — the status moved AWAY from advancing, not toward it. Lysander adopted a six-month data-center moratorium on 2026-05-07 after organised opposition, so the project remains proposed with no local approval. Community reception is documented as opposition ('Citizens Against Lysander Data Center'); the record already carries a community value so I have not proposed overwriting it. Note the acreage differs between sources (124 acres in the Eagle News piece, 120 in Rockefeller) — not resolved, and landAcres is already populated.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · source-reported proposed
Early-stage hyperscale data center proposal on ~120 acres in Lysander, Onondaga County; interconnection request up to 300 MW
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Ranalli Lysander Data Center · Cleanview
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- Yahoo News
- Possible massive data center in Lysander faces community opposition, town attorney to draft moratorium · Eagle News Online / Baldwinsville Messenger
- Updates on the Cloud: More Moratoriums on Data Centers · Rockefeller Institute of Government
- Onondaga County launches $500K study to guide towns on AI data centers · CNY Central
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID ranalli-lysander-ny. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001246
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Lysander, NY · Onondaga (Approximate location)
Roles
- Operator: Ranalli
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 120 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: National Grid
Utility as named by the provider.
- Power source: Grid
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: opposed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-21
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.