Licensed lead · not independently verified · dcd-dir-001242

Gibraltar Data Center (former McLouth Steel site)

source-reported proposed

Raeden (with Cal Realty / Ferragon Corp.)

27800 W. Jefferson Avenue · Gibraltar · Wayne County · Michigan

Reported planned 100 MWSource updated 21 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Gibraltar Data Center (former McLouth Steel site).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Raeden (with Cal Realty / Ferragon Corp.)
Address and locality
27800 W. Jefferson Avenue · Gibraltar · Wayne County · Michigan
Official metro area
Detroit-Warren-Dearborn, MI
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
21 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001242

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Community response
Provider label: litigationCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Community. Gibraltar City Council passed a one-year data-center moratorium on 2026-03-09, after Raeden had already submitted its application. Raeden and Cal Realty sued the city on 2026-08-17 in U.S. District Court for the Eastern District of Michigan (Judge Robert White), alleging the moratorium unfairly singles out their application and that an application submitted in good faith is entitled to review under the pre-moratorium ordinance. …

What the source record says

100 MW proposal on the former McLouth Steel plant site (operated from the 1950s to 1996, now a steel processing site) at 27800 W. Jefferson Ave., with an adjacent Superfund property at 28000 W. Jefferson. Status remains 'proposed', not 'cancelled': the application is blocked by the moratorium and is the subject of active litigation, not a denial. CONFIRMED ABSENCES: no acreage, investment figure, water figure, or job count is stated in either source. The '80,000 households' comparison is the source's characterisation of the 100 MW draw, not an additional measured figure. Coordinates are the US Census geocoder's match for the street address named in the source; the parcel is not confirmed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-02 · source-reported proposed

    Application submitted to the city; the city asked for additional detail.

    Open cited source →

  2. 2026-03 · source-reported proposed

    City council passed a one-year data-center moratorium on 2026-03-09, halting consideration.

    Open cited source →

  3. 2026-08 · source-reported proposed

    Developers filed suit on 2026-08-17 seeking a declaration that the moratorium is invalid and an order compelling the city to approve the plans.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID raeden-gibraltar-mclouth-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001242

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 27800 W. Jefferson Avenue, Gibraltar, MI · Wayne (Approximate location)

Roles

  • Operator: Raeden (with Cal Realty / Ferragon Corp.)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-02 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-03 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-08 · source-reported proposed

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: litigation

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →