Reported planned 600 MWSource updated 15 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Bedington Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Penzance Management
Address and locality
Berkeley County · West Virginia
Official metro area
Hagerstown-Martinsburg, MD-WV
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 600 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
15 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001115
Dated source review

The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.

  • Source review · reviewed 2026-10-09: On February 26, 2026 the West Virginia governor announced approval of the High Impact Intelligence Center designation for the Penzance Bedington project. This identifies the designation milestone more precisely. It does not establish blanket permitting, construction, operation or microgrid certification.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Potomac Edison (FirstEnergy)Utility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Land area
548 acres (source-reported; parcel boundary not established)
Announced investment
$4 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
125 permanent · 1,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
February 2026Provider-reported announcement date.

Provider notes

Energy. Governor described project as 'likely' grid-connected via existing electric utilities

Water. Reclaimed water systems for cooling to reduce dependence on potable water

Community. 300+ residents packed a Spring Mills High School town hall (March 2026) over water, flooding, eminent-domain, and loss-of-local-zoning-control (HB 2014) concerns, backed by an organized 'No Data Centers in the Eastern Panhandle' Facebook group; no vote has been held yet.

What the source record says

Falling Waters District, Berkeley County WV eastern panhandle — adjacent to Maryland border. 1.9 million sq ft at full buildout. Penzance (DC/NoVA developer) is also developing a Fairfax County VA campus reportedly pre-leased to Amazon. Coordinates approximate for Falling Waters area. Re-checked 2026-09-10: status unchanged (proposed). Most recent coverage found (wvgazettemail article, published 2026-02-28, updated 2026-09-04) reports no groundbreaking, permit, or construction start yet; a tenant announcement was still described as pending later in 2026. address remains unresolved: checked governor.wv.gov, WV Division of Economic Development, SEDC, and county/trade press coverage — all describe only '548 acres in the Falling Waters District of Berkeley County' with no house number or parcel ID; Berkeley County GIS/assessor records were not reachable this session, so location.street is left unfilled rather than approximated. CONFIRMED ABSENCE (2026-09-10): the Governor's office states explicitly that no state funding was used for Bedington Campus. HB 2014's revenue-sharing formula (50% Personal Income Tax Reduction Fund / 30% host county / 10% all counties per capita / 5% Electric Grid Stabilization and Security Fund / 5% Economic Enhancement Grant Program) is a distribution of the taxes the facility itself will generate, not an incentive granted to the facility, so it is not recorded as a subsidy. No county-level PILOT or abatement agreement was found in sources checked this session (governor.wv.gov, WV DED, SEDC).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-02 · source-reported proposed

    Announced February 26, 2026 by Governor Morrisey; designated West Virginia's first High Impact Intelligence Center (enabling bypass of certain local zoning constraints); site preparation underway as of March 2026. No state funding involved.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID penzance-bedington-berkeley-county-wv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001115

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • WV · Berkeley (Approximate location)

Roles

  • Operator: Penzance Management

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: February 2026

    Provider-reported announcement date.

  • Status history: 2026-02 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 548 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 600 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Potomac Edison (FirstEnergy)

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $4 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 125 permanent · 1,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-15

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →