Niagara Digital Campus

source-reported proposed

Urbacon Data Centre Solutions

Niagara Falls · Niagara County · New York

Reported planned 135 MWSource updated 9 September 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Niagara Digital Campus.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Urbacon Data Centre Solutions
Address and locality
Niagara Falls · Niagara County · New York
Official metro area
Buffalo-Cheektowaga, NY
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 135 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
9 September 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001049

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
New York Power Authority (NYPA)Utility as named by the provider.
Power source
HydroProvider label.
Land area
142 acres (source-reported; parcel boundary not established)
Announced investment
$1.5 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
550 permanent · 5,600 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

Provider notes

Energy. Site at 907 Falls St (Rainbow and John B. Daly Blvd); 600,000 sq ft across two phases; new electrical substation planned for the campus.

Community. Planning Board rejected modified application in December 2025. By early 2026 Mayor Restaino adopted conciliatory tone, proposing a two-project solution accommodating both data center and Centennial Park. New application incorporating additional Falls Street parcels filed April 2026.

What the source record says

Site is near the historic Adams Power Plant and the NYPA Robert Moses Niagara Power Plant (2,675 MW combined capacity). Phase I planned as ~282,000 sq ft over 24 months from groundbreaking. Economic impact estimated at $2B over 20 years per MRB Group analysis commissioned by NFR. Developed by Niagara Falls Redevelopment (NFR, controlled by Milstein family) in partnership with Urbacon. NO STATUS CHANGE. The 4 June 2026 City Council vote settled an eminent-domain lawsuit and transferred 10 acres to the city; the mayor states explicitly it was not a data-center approval and that there is no timeline for work to begin. Remains proposed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-01 · source-reported proposed

    Niagara Falls Redevelopment (NFR) and Urbacon Data Centre Solutions announce $1.5B campus proposal at Rainbow and John B. Daly Boulevards

    Open cited source →

  2. 2025-12 · source-reported proposed

    Planning Board rejects modified application; parties reported near resolution including possible two-project accommodation

    Open cited source →

  3. 2026-04 · source-reported proposed

    New application incorporating additional Falls Street parcels under review; NFR states construction could begin within six months of approvals

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID niagara-digital-campus-niagara-falls-ny. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001049

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Niagara Falls, NY (Exact location)

Roles

  • Operator: Urbacon Data Centre Solutions

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2024-01 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-12 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-04 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 142 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 135 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: New York Power Authority (NYPA)

    Utility as named by the provider.

  • Power source: Hydro

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $1.5 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 550 permanent · 5,600 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-09

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →