Licensed lead · not independently verified · dcd-dir-001023

Appeal Digital Park

source-reported proposed

Natelli Holdings

10475 Solomons Island Road · Lusby · Calvert County · Maryland · 20657

Reported planned 300 MWSource updated 10 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Appeal Digital Park.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Natelli Holdings
Address and locality
10475 Solomons Island Road · Lusby · Calvert County · Maryland · 20657
Official metro area
Lexington Park, MD
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
10 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001023

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
SMECOUtility as named by the provider.
Power source
GridProvider label.
Cooling
EvaporativeProvider label.
Reported water use
0.4 million gallons per day (source-reported)Whether this is metered use, a permit limit or a request is not established; see the provider water note.
Land area
133 acres (source-reported; parcel boundary not established)
Announced jobs
110 permanent · 6,100 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →

Provider notes

Energy. Connection to the SMECO transmission grid via a new on-site substation, cost borne by the developer.

Water. Developer states cooling would use non-potable water from the Solomons Wastewater Treatment Plant, averaging about 0.4 MGD and reaching roughly one million gallons on peak summer days, with about one third evaporated and two thirds recirculated.

What the source record says

Four data center buildings of roughly 200,000-220,000 sq ft each, about 70 feet tall, on 133 acres of county-owned I-2 heavy industrial land — the former Dominion Cove Point laydown site — paired with a pledged $30 million regional park on a separate Dominion-donated parcel. Capacity, water and jobs figures are developer-supplied. As of the county's data center page, no site plan application has been filed, and Calvert County's six-month moratorium on data center site plan approvals takes effect Aug. 28, 2026. Re-checked 2026-09-10: status confirmed PROPOSED, no change. Developer's own project page confirms 300 MW capacity (already in existing record, not re-filed) and states timelines remain 'subject to change...dependent upon final design development, regulatory approvals, and other factors' -- i.e. no firmer status yet. Attempted to fetch thebaynet.com's $30M-park and investment-cost coverage twice this run for investmentUsd and community.status but both returned HTTP 429 (rate-limited, not fetched) -- so no investmentUsd or community field is reported; those remain open for a future run against a non-rate-limited mirror.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-03-24 · source-reported proposed

    Natelli Holdings presented a proposal to purchase 133 acres of county-owned land (the former Dominion laydown site) at the Board of County Commissioners meeting; Calvert County held a public information meeting on April 6, 2026.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID natelli-appeal-digital-park-lusby-md. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001023

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 10475 Solomons Island Road, Lusby, MD 20657 · Calvert (Approximate location)

Roles

  • Operator: Natelli Holdings

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-03-24 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 133 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: SMECO

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Evaporative

    Provider label.

  • Reported water use: 0.4 million gallons per day (source-reported)

    Whether this is metered use, a permit limit or a request is not established; see the provider water note.

Permits, incentives, jobs and proceedings

  • Announced jobs: 110 permanent · 6,100 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-10

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →