Massachusetts Green High Performance Computing Center

source-reported operational

MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale)

100 Bigelow Street · Holyoke · Hampden County · Massachusetts · 01040

Reported operational 15 MWSource updated 6 October 2026exact location (provider label) · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Massachusetts Green High Performance Computing Center.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale)
Address and locality
100 Bigelow Street · Holyoke · Hampden County · Massachusetts · 01040
Official metro area
Springfield, MA
Source-reported status
operational
Provider facility type
data center
Reported capacity
Operational: 15 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
6 October 2026
Location precision
exact (provider label)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000959

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
City of HolyokeUtility as named by the provider.
Power source
GridProvider label.
Land area
8.6 acres (source-reported; parcel boundary not established)

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • state pledge toward MGHPCC construction costs · Massachusetts · $25 million (as stated) Open cited source →

Provider notes

Energy. MIT CSAIL's facility page states a 15-megawatt utility connection from Holyoke Gas & Electric, "about 70% of which is sourced locally from hydroelectric facilities on the Connecticut River", and that MGHPCC shares a 34.5 kV bus with the Hadley Falls hydroelectric station. Recorded as source=grid rather than hydro because the supply is a utility connection with a majority - not exclusive - hydro mix.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Cooling: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.

What the source record says

90,300 sq ft, opened 2012, hydro-powered university research-computing consortium (100 Bigelow St). Explicitly exempted from Holyoke's 2026 data center ban. Houses the MIT Lincoln Laboratory Supercomputing Center (LLSC / TX-GAIA) — recorded as one facility, not two.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2012 · source-reported operational

    Opened 2012

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID mghpcc-holyoke-ma. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale) on its website (captured 6 October 2026)
Name as listed
Massachusetts Green High Performance Computing Center
Address as published
100 Bigelow Street, Holyoke, MA 01040

Lifecycle status is not published for this listing.

MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale) · Massachusetts Green High Performance Computing Center — Additional operator-reported details

  • Certification or compliance claim: Company states LEED Platinum certification Certification · facility scope

    Company-reported. Not independently verified.

    A company statement. No issuer record confirming it for this site is recorded here.

    Open cited source → Captured 2026-10-06.

Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Open the operator’s page (1) → captured 6 October 2026
Open the operator’s page (2) → captured 6 October 2026

Matched to this licensed row on identical full street address.

Independently reviewed match

This exact source identifier is linked to Massachusetts Green High Performance Computing Center. The licensed row remains a separate discovery record.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000959

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 100 Bigelow Street, Holyoke, MA 01040 · Hampden (Exact location)

Roles

  • Operator: MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2012 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 8.6 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Operational: 15 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: City of Holyoke

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Incentive reported by the source: state pledge toward MGHPCC construction costs · Massachusetts · $25 million (as stated)

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-06

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →