Licensed lead · not independently verified · dcd-dir-000843

Joliet Technology Center

source-reported permitted

HW Technology Park (Hillwood Investment Properties / PowerHouse Data Centers)

Joliet · Will County · Illinois

Reported planned 1,800 MWSource updated 3 August 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Joliet Technology Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
HW Technology Park (Hillwood Investment Properties / PowerHouse Data Centers)
Address and locality
Joliet · Will County · Illinois
Official metro area
Chicago-Naperville-Elgin, IL-IN
Source-reported status
permitted
Provider facility type
data center
Reported capacity
Planned: 1,800 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
3 August 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000843

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
ComEdUtility as named by the provider.
Power source
GridProvider label.
Land area
795 acres (source-reported; parcel boundary not established)
Announced investment
$20 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
700 permanent · 7,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: litigationCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
October 2025Provider-reported announcement date.

Provider notes

Energy. ComEd substation to be built at site, funded by HW Technology Park; developer seeking own electricity supply independently

Community. Hundreds of residents filled council chambers and overflow rooms; concerns over water/electricity consumption, noise pollution, and proximity to residential areas. Post-approval lawsuit filed naming City of Joliet, PowerHouse, and Hillwood as defendants.

What the source record says

Coordinates approximate Jackson Township at Rowell and Bernhard Rds, south Joliet (~40 mi SW of Chicago), near Chicagoland Speedway. 24 two-story buildings planned. No confirmed hyperscale tenant as of permit date. Construction start targeted early 2027; first sub-campus by 2028. Construction jobs range reported as 7,000-10,000; permanent approximately 700.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-10 · source-reported proposed

    Hillwood announced 795-acre data center campus planned on south Joliet farmland; Plan Commission recommendation scheduled October 16, 2025

    Open cited source →

  2. 2026-03 · source-reported permitted

    Joliet City Council voted 8-1 to approve annexation and development plan on March 19, 2026

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID joliet-technology-center-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000843

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Joliet, IL · Will (Approximate location)

Roles

  • Operator: HW Technology Park (Hillwood Investment Properties / PowerHouse Data Centers)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported permitted

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: October 2025

    Provider-reported announcement date.

  • Status history: 2025-10 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-03 · source-reported permitted

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 795 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 1,800 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: ComEd

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $20 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 700 permanent · 7,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: litigation

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-03

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →