Licensed lead · not independently verified · dcd-dir-000796

HostDime Orlando Tier IV Data Center

source-reported under construction

HostDime

1 Innovative Place · Eatonville · Orange County · Florida · 32751

Capacity not statedSource updated 21 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for HostDime Orlando Tier IV Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
HostDime
Address and locality
1 Innovative Place · Eatonville · Orange County · Florida · 32751
Official metro area
Orlando-Kissimmee-Sanford, FL
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not stated
Source freshness
21 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000796

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Land area
5 acres (source-reported; parcel boundary not established)
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Community. Eatonville Town Council members have pushed for transparency and raised water/power/noise/appearance concerns; the town has assessed missed-deadline fines. No lawsuit or formal permit denial identified as of Aug 2026.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Cooling: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.

What the source record says

5-acre parcel (of the historic 99-acre Hungerford tract) fronting I-4 at Wymore Rd -- governing municipality is Eatonville, not Maitland; HostDime's own current marketing copy lists a mailing address of "1 Innovative Pl, Maitland, FL 32751" while an aggregator (baxtel) lists "1000 Wymore Rd, Eatonville, FL" for the same building -- both addresses are disputed/unverifiable via parcel search, so no street field is recorded. 100,000 sq ft, 7-story building, 3 data-center floors, >1,000 racks. Groundbreaking May 2021; HostDime's own landing page and data-sheet page disagree on completion quarter (Q3 2026 vs Q2 2026) and the project has slipped repeatedly since an original ~2024 target; as of ClickOrlando's June 2026 report the facility was still not open. Investment is conflicting and stale: GrowthSpotter (Oct 2023) reported an original $35M budget grown to $58M actual (65.7% overrun); a separately-circulating $100M figure is single-sourced and unreconciled, so no investmentUsd is recorded. No disclosed capacityMw. Distinct from HostDime's unrelated, already-operational 25,000 sq ft Tier III facility at 440 W Kennedy Blvd, Orlando. Eatonville Town Council (led by Councilwoman Wanda Randolph) has pushed a transparency measure over electricity/water use, noise, and appearance, and has assessed missed-deadline fines ($250-500/day); this intersects Florida SB 484 (effective July 1, 2026), which expands local authority over large-load customers and data-center water permits. Re-checked 2026-09-10: still under_construction. HostDime has requested multiple deadline extensions from the town of Eatonville (this is the third); September 2026 reporting says the facility could open as early as October 2026 pending final inspection.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID hostdime-eatonville-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by HostDime on its website (captured 28 September 2026)
Name as listed
SuperNova
Address as published
1 Innovative Place, Eatonville, FL 32751

Status on the operator’s page: under construction. Normalized from the operator’s own wording; not independently verified. Open the operator’s page → Captured 28 September 2026.

Critical IT: 5 MW. Scope facility · stated as planned. Critical IT capacity as stated for this facility. Not utility power, generation, or measured load. The source describes this as planned, not a measured live figure. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 28 September 2026.

Utility power: 20 MW. Scope facility · stated as planned. Utility power as stated for this facility. Not critical IT capacity or measured load. The source describes this as planned, not a measured live figure. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 28 September 2026.

Floor area: 100,000 square feet. Scope facility · stated as planned. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source describes this as planned, not a measured live figure. No effective date is stated; the capture date is not the measurement date. Captured 28 September 2026.

Tier: Tier IV (operator wording: design). Scope facility · design rating as stated. Tier level as the operator states it for this facility. The operator's own wording (design) is kept; an Uptime Institute certification is not established by this page. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 28 September 2026.

Expected: 2026. Scope facility · stated as planned. Expected opening or completion year as the operator states it for this facility. A plan, not a delivered facility. Open the operator’s page → Captured 28 September 2026.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Open the operator’s page → captured 28 September 2026

Matched to this licensed row on identical full street address.

Independently reviewed match

This exact source identifier is linked to HostDime AI/Data Center. The licensed row remains a separate discovery record.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000796

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 1 Innovative Place, Eatonville, FL 32751 · Orange (Approximate location)

Roles

  • Operator: HostDime

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

Area, acreage and buildings

  • Land area: 5 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →