Licensed lead · not independently verified · dcd-dir-000759

Green Data Spaceport America Data Center

source-reported cancelled

Green Data / Aetherion Inc.

Sierra County · New Mexico

Capacity not established; source review excludes the published figureSource updated 10 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Green Data Spaceport America Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Green Data / Aetherion Inc.
Address and locality
Sierra County · New Mexico
Official metro area
Outside an official metropolitan boundary
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
10 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000759
Capacity held out of the public projection.

The source note states that capacity has not been disclosed, so the stored planned figure is not repeated. The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
MixedProvider label.
Cooling
Closed-loopProvider label.
Land area
21 acres (source-reported; parcel boundary not established)
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
July 2026Provider-reported announcement date.

Provider notes

Energy. Proposal pairs on-site solar generation and battery storage covering 'a substantial portion' of demand with a utility connection; the developer's stated objective is to offset annual grid purchases with on-site renewable generation.

Water. Proposed closed-loop system: ~30,300 gallon initial fill, ~15,300 gallons/year (~42 gal/day) makeup water. No water source had been identified or validated as of Aug 2026.

Community. Residents organized as 'Project Consequences'; the Sierra County Commission unanimously converted a resolution into an 18-month data center moratorium on July 21, 2026. No lease, sublease, construction or development agreement has been executed. On 2026-09-03 NM State Land Commissioner Stephanie Garcia Richard formally rejected the Aetherion sublease and ruled the county moratorium applies to Spaceport America despite it being state trust land — “Simply put, I will not be approving any data centers, including the proposed Aetherion sublease at Spaceport America” (see source 4). …

What the source record says

Sited on state trust land inside Spaceport America's 18,000-acre lease outside Truth or Consequences. Current plan would occupy 21 acres within the horizontal launch area, possibly plus 30 additional acres. Spaceport America says discussions with Green Data have been ongoing since 2021 and that the project 'is not a relocation of the Socorro proposal'; only 'limited planning agreements' are in effect. Capacity has not been disclosed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-07-20 · source-reported proposed

    Public records surfaced a State Land Office sublease application, signed by Spaceport America director Scott McLaughlin in February 2026, to rent land to Green Data developer Aetherion Inc. for $176,400 annually; the application remains under review by the Commissioner of Public Lands.

    Open cited source →

  2. 2026-09-03 · source-reported cancelled

    The NM State Land Office rejected the Aetherion/Green Data sublease proposal at Spaceport America on 2026-09-03, and Land Commissioner Stephanie Garcia Richard ruled Sierra County's 2026-07-21 data-center moratorium applies to Spaceport activity despite it sitting on state trust land. Spaceport's executive director Scott McLaughlin said the facility will honor the decision. The developer (Jason Bak) did not respond to comment and left the door open to a future proposal once moratoria expire, but this specific sublease proposal is dead as of this report.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID green-data-spaceport-america-sierra-county-nm. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000759

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • NM · Sierra (Approximate location)

Roles

  • Operator: Green Data / Aetherion Inc.

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: July 2026

    Provider-reported announcement date.

  • Status history: 2026-07-20 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-09-03 · source-reported cancelled

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 21 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Mixed

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-10

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →