Licensed lead · not independently verified · dcd-dir-000567

Kingsboro AI Data Center Campus

source-reported permitted

Energy Storage Solutions

Rocky Mount · Edgecombe County · North Carolina

Reported planned 900 MWSource updated 15 August 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Kingsboro AI Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Energy Storage Solutions
Address and locality
Rocky Mount · Edgecombe County · North Carolina
Official metro area
Rocky Mount, NC
Source-reported status
permitted
Provider facility type
data center
Reported capacity
Planned: 900 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
15 August 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000567
Dated source review

The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.

  • status history (provider entry dated 2026): This provider entry is dated "2026". A local report published 2025-11-12 says the county approved the ordinance amendment that Monday.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
On-site gasProvider label.
Land area
155 acres (source-reported; parcel boundary not established)
Announced investment
$19.2 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
2025Provider-reported announcement date.

Provider notes

Energy. Planned as a natural-gas-powered campus with an on-site natural gas generation facility and the ability to sell surplus power back to local utilities; roughly $176 million in regional energy infrastructure upgrades is estimated. Residents' opposition has centered on the on-site gas generation and diesel backup rather than grid supply.

Community. Edgecombe County commissioners unanimously approved a zoning-ordinance amendment enabling the Kingsboro project (Nov 2025) with no opposition documented at that hearing; a separate, smaller ESS project at another Tarboro site had been rejected by the town council earlier in 2025 amid resident opposition.

What the source record says

$19.2B, 900 MW AI data-center campus on ~155 acres in Kingsboro Business Park between Rocky Mount and Tarboro, Edgecombe County. County cleared the way in Nov 2025 by amending its development ordinance; buildout planned across ~24 phases over 3-5 years. Twin campus announced for Fayetteville.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · source-reported proposed

    Energy Storage Solutions announced a ~$19.2B, 900 MW AI data-center campus at Kingsboro Business Park.

    Open cited source →

  2. 2026 · source-reported permitted

    Edgecombe County amended its Unified Development Ordinance to allow data-center use at Kingsboro Business Park; groundbreaking slated for Q1 2026 once final permits secured.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID energy-storage-solutions-kingsboro-edgecombe-county-nc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000567

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Rocky Mount, NC · Edgecombe (Approximate location)

Roles

  • Operator: Energy Storage Solutions

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported permitted

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2025

    Provider-reported announcement date.

  • Status history: 2025 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026 · source-reported permitted

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 155 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 900 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: On-site gas

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $19.2 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-15

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →