Etheridge Lakes Data Center (Great Bridge)

source-reported cancelled

Emerald Lakes Estates (Doug Fuller)

Chesapeake · Chesapeake (independent city) · Virginia

Capacity not statedSource updated 26 August 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Etheridge Lakes Data Center (Great Bridge).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Emerald Lakes Estates (Doug Fuller)
Address and locality
Chesapeake · Chesapeake (independent city) · Virginia
Official metro area
Virginia Beach-Chesapeake-Norfolk, VA-NC
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Not stated
Source freshness
26 August 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000562

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Dominion Energy VirginiaUtility as named by the provider.
Land area
22.6 acres (source-reported; parcel boundary not established)
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment.

Provider notes

Community. Chesapeake City Council denied the rezoning; project did not proceed.

What the source record says

22.6-acre parcel on west side of Centerville Turnpike, south of Etheridge Manor Boulevard, Great Bridge area of Chesapeake. Developer Doug Fuller (Emerald Lakes Estates) sought rezoning from agricultural to light industrial; proposed 350,000 sq ft, 35 ft tall, 24/7 staffed facility. City Council denied the rezoning request unanimously. Separately, in July 2026 the Chesapeake Planning Commission recommended a citywide data-center zoning ordinance/policy (conditional use in industrial districts + Fentress Airfield Overlay only) — this is a POLICY change, not a site-specific candidate, and is not included here. No other active Chesapeake DC site rezoning was found this session. Coordinates are approximate (Centerville Turnpike/Great Bridge area); exact parcel not geocoded from GIS this session. Chesapeake City Council denied the rezoning 7-0 on 2025-06-17 (Planning Commission had recommended denial 6-1). Recorded as a cancelled proposal.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-06-17 · source-reported cancelled

    cancelled per City of Chesapeake Department of Planning, Rezoning Case PLN-REZ-2025-002 (Etheridge Lakes Data Center)

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID emerald-lakes-etheridge-lakes-data-center-chesapeake-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000562

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Chesapeake, VA · Chesapeake (independent city) (Approximate location)

Roles

  • Operator: Emerald Lakes Estates (Doug Fuller)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2025-06-17 · source-reported cancelled

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 22.6 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Dominion Energy Virginia

    Utility as named by the provider.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-26

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →