DigiCo LAX1 (1977 Saturn Street)

source-reported cancelled

DigiCo Infrastructure REIT

1977 Saturn Street · Monterey Park · Los Angeles County · California · 91755

Capacity not statedSource updated 2 August 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for DigiCo LAX1 (1977 Saturn Street).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
DigiCo Infrastructure REIT
Address and locality
1977 Saturn Street · Monterey Park · Los Angeles County · California · 91755
Official metro area
Los Angeles-Long Beach-Anaheim, CA
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Not stated
Source freshness
2 August 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000448

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
October 2024Provider-reported announcement date.

Provider notes

Community. Measure NDC, a permanent citywide data-center ban, passed 88.34% (10,321-1,362) in a June 2, 2026 special election and was implemented via Ordinance 2279; the applicant's withdrawal (March 31, 2026) preceded the vote. The community group 'No Data Center MPK' cited approximately 12 million gallons/year of water use, approximately 434 GWh/year of power draw, noise, and approximately 77,034 metric tons CO2e/year, sourced to the applicant's own Initial Study/MND.

What the source record says

DigiCo Infrastructure REIT is externally managed by HMC Capital (ASX-listed); the applicant/signing entity was HMC StratCap 1977 Saturn, LLC. Approximately 250,000 sq ft hyperscale data center campus planned at 1977 Saturn Street, adjacent to a companion site at 1980 Saturn Street (referred to in trade coverage as DigiCo 'LAX2') which is NOT tracked as a separate record here - LAX2's specifics trace only to aggregator listings with no independent primary or press confirmation found this pass; it is being divested in the same HMC Capital transaction. Capacity disputed, omitted: sources disagree materially (49.5-50 MW per Fox Business and No Data Center MPK, citing the applicant's own Initial Study/MND; approximately 56 MW per aggregators, apparently derived from 14 backup diesel generators at 4 MW each; 66-72 MW per CoStar describing 'the original proposal') and the primary withdrawal letter discloses no MW figure at all. Acreage disputed, omitted: approximately 5 acres per a community group's math from the building footprint versus 16 acres per Baxtel (aggregator-only - treated as unconfirmed). HMC Capital bought the parcel for approximately $39M (December 2024) and has agreed to sell it back for roughly $39M plus $33.5M for the adjacent LAX2 site plus a $10M contingent earn-out, settling in H1 FY27 - real-estate transaction values, not construction capex, since the facility was never built; investmentUsd is left unset. No jobs figures disclosed anywhere. No AI/HPC-specific marketing language found for this project. City had a pre-existing data-center moratorium before this project surfaced. Coordinates are an approximate street-level geocode, not a parcel-confirmed point.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-10 · source-reported proposed

    Initial Study/Mitigated Negative Declaration filed for Development Agreement No. 24.02 / Site Development Plan No. 24-040 (revised October 2025).

    Open cited source →

  2. 2026-03-31 · source-reported cancelled

    HMC StratCap 1977 Saturn, LLC (a DigiCo Infrastructure REIT subsidiary) formally withdrew Development Agreement No. 24.02 / Site Development Plan No. 24-040 in a signed letter to the Monterey Park City Council (signed by Interim CEO Chris Maher) - filed before, not after, the city's Measure NDC ballot vote.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID digico-lax1-monterey-park-ca. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000448

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 1977 Saturn Street, Monterey Park, CA 91755 · Los Angeles (Approximate location)

Roles

  • Operator: DigiCo Infrastructure REIT

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: October 2024

    Provider-reported announcement date.

  • Status history: 2024-10 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-03-31 · source-reported cancelled

    Status history supplied by the source.

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-02

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →