This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Holder Industrial Park Data Center Expansion (withdrawn).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Deltona Corporation
- Address and locality
- Lecanto · Citrus County · Florida
- Official metro area
- Homosassa Springs, FL
- Source-reported status
- cancelled
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000444
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Community response
- Provider label: opposed
Provider notes
Community. More than 200 residents attended the Planning and Development Commission's public hearing, the vast majority speaking in opposition, citing water and electricity use, artificial light in a rural area, and a continuous low-frequency hum.
What the source record says
Site described as near County Road 491 & Tram Road, Lecanto, within/adjoining the existing 557-acre Holder Industrial Park. Sources disagree on the exact expansion acreage (352Today describes a 675-777 acre 'Data Center Use Area' within a >1,300-acre rezoning request; FloridaDataCenters.org describes expansion to ~813 acres) so landAcres is omitted rather than picking one. No specific data-center operator/tenant beyond landowner-developer Deltona Corporation (attorney of record: Sid Ansbacher) was named in any source found this run. The withdrawal came after a county-wide data-center moratorium took effect May 26, 2026 — any future Deltona filing on this site is now a new filing subject to that 12-month moratorium, per FloridaDataCenters.org. Coordinates are an approximate geocode of Lecanto, the nearest named place in sourcing, not the parcel itself.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-01 · source-reported proposed
Deltona Corporation filed applications to expand the existing 557-acre Holder Industrial Park and add data-center uses ('information processing', 'data center utilities', 'data storage') as permitted uses.
- 2026-06-23 · source-reported cancelled
Deltona withdrew both applications rather than face a July 14, 2026 commission vote, after the Planning and Development Commission unanimously recommended denial following an 8-hour public hearing.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Citrus County panel rejects Holder Industrial Park data center rezoning · Bay News 9
- Company Withdraws Controversial Industrial Park Data Center Proposal in Citrus County · 352Today
- Citrus County Data Centers — Deltona Corp Filing · FloridaDataCenters.org
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID deltona-holder-industrial-park-citrus-county-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000444
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Lecanto, FL · Citrus (Approximate location)
Roles
- Operator: Deltona Corporation
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported cancelled
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026-01 · source-reported proposed
Status history supplied by the source.
- Status history: 2026-06-23 · source-reported cancelled
Status history supplied by the source.
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Community response: Provider label: opposed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-10
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.