Licensed lead · not independently verified · dcd-dir-000444

Holder Industrial Park Data Center Expansion (withdrawn)

source-reported cancelled

Deltona Corporation

Lecanto · Citrus County · Florida

Capacity not statedSource updated 10 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Holder Industrial Park Data Center Expansion (withdrawn).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Deltona Corporation
Address and locality
Lecanto · Citrus County · Florida
Official metro area
Homosassa Springs, FL
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Not stated
Source freshness
10 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000444

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Community. More than 200 residents attended the Planning and Development Commission's public hearing, the vast majority speaking in opposition, citing water and electricity use, artificial light in a rural area, and a continuous low-frequency hum.

What the source record says

Site described as near County Road 491 & Tram Road, Lecanto, within/adjoining the existing 557-acre Holder Industrial Park. Sources disagree on the exact expansion acreage (352Today describes a 675-777 acre 'Data Center Use Area' within a >1,300-acre rezoning request; FloridaDataCenters.org describes expansion to ~813 acres) so landAcres is omitted rather than picking one. No specific data-center operator/tenant beyond landowner-developer Deltona Corporation (attorney of record: Sid Ansbacher) was named in any source found this run. The withdrawal came after a county-wide data-center moratorium took effect May 26, 2026 — any future Deltona filing on this site is now a new filing subject to that 12-month moratorium, per FloridaDataCenters.org. Coordinates are an approximate geocode of Lecanto, the nearest named place in sourcing, not the parcel itself.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-01 · source-reported proposed

    Deltona Corporation filed applications to expand the existing 557-acre Holder Industrial Park and add data-center uses ('information processing', 'data center utilities', 'data storage') as permitted uses.

    Open cited source →

  2. 2026-06-23 · source-reported cancelled

    Deltona withdrew both applications rather than face a July 14, 2026 commission vote, after the Planning and Development Commission unanimously recommended denial following an 8-hour public hearing.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID deltona-holder-industrial-park-citrus-county-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000444

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Lecanto, FL · Citrus (Approximate location)

Roles

  • Operator: Deltona Corporation

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-01 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-06-23 · source-reported cancelled

    Status history supplied by the source.

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-10

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →