Licensed lead · not independently verified · dcd-dir-000442

Deep Green Lansing Data Center

source-reported cancelled

Deep Green

Cedar Street and Larch Street · Lansing · Ingham County · Michigan

Reported planned 24 MWSource updated 14 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Deep Green Lansing Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Deep Green
Address and locality
Cedar Street and Larch Street · Lansing · Ingham County · Michigan
Official metro area
Lansing-East Lansing, MI
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Planned: 24 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
14 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000442

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
OtherProvider label.
On-site generation
16 MW (source-reported)On-site figures often describe backup generators rather than primary supply; read the provider energy note.
Cooling
Closed-loopProvider label.
Land area
2.5 acres (source-reported; parcel boundary not established)
Announced investment
$120 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Energy. Source describes a 16-megawatt fuel cell plant paired with the data center. The fuel feedstock is not stated in the source, so energy.source is recorded as 'other' rather than assuming natural gas.

Water. Project representative states a closed-loop cooling system using 500,000 gallons of water a year. That is an annual figure, not a daily one, so reportedMgd is omitted rather than converted (0.5 million gallons per YEAR is not 0.5 MGD).

Community. The Lansing Planning Commission rejected the rezoning request in December 2025 and then voted 5-2 on 2026-03-03 to recommend that the city council rezone the land. The source records the split votes and the earlier rejection but does not attribute a stated reason to the opposing votes, so 'mixed' rather than 'contested'.

What the source record says

Downtown Lansing infill project on a 2.5-acre city parking lot at Cedar and Larch Street, developed by U.K.-based Deep Green. STATUS CONFLICT, resolved in favour of the later source: the Lansing State Journal source (2026-03) shows the planning commission recommending rezoning, but Gander Newsroom's continuously-updated Michigan tracker (retrieved 2026-09-09) lists the application as WITHDRAWN in April 2026, so status is recorded as 'cancelled'. A withdrawn application is not necessarily permanent abandonment and this should be re-checked before publishing. On the March position: as of the source, the planning commission had only RECOMMENDED rezoning to the city council; no council rezoning or site-plan approval is recorded. The buy-sell agreement gives the city a right to buy the land back if the project does not proceed within two years. No investment figure, job counts, or incentive agreement is stated in the source. Coordinates are the US Census geocoder's match for the Cedar St / N Larch St intersection named in the source; the parcel itself is not confirmed. Investment of $120 million and the 24 MW figure are both from the Gander tracker; the 24 MW also appears in the Lansing State Journal source.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-03 · source-reported proposed

    Planning commission voted 5-2 to recommend rezoning, reversing its December 2025 rejection.

    Open cited source →

  2. 2026-04 · source-reported cancelled

    Gander Newsroom's running Michigan data-center tracker records the application as withdrawn in April 2026, after the March planning-commission recommendation.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID deep-green-lansing-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000442

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Cedar Street and Larch Street, Lansing, MI · Ingham (Approximate location)

Roles

  • Operator: Deep Green

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-03 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-04 · source-reported cancelled

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 2.5 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 24 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Other

    Provider label.

  • On-site generation: 16 MW (source-reported)

    On-site figures often describe backup generators rather than primary supply; read the provider energy note.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $120 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →