This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Creekstone Energy Delta Gigasite.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Creekstone Energy
- Address and locality
- Delta · Millard County · Utah
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 10,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 13 October 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000343
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- PacifiCorp
- Power source
- Mixed
- On-site generation
- 300 MW (source-reported)
- Cooling
- Air
- Land area
- 1,143 acres (source-reported; parcel boundary not established)
- Announced investment
- $17 billion
- Announced jobs
- 106 permanent
- AI-use label (provider)
- confirmed
- Announced
- December 2025
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Rural Economic Development Tax Increment Financing (REDTIF) — 50% post-performance tax credit · Utah Governor's Office of Economic Opportunity · 2025 Open cited source →
Provider notes
Energy. 43,000 Dth/day natural gas via executed interconnect; 13,000-acre SITLA solar lease (largest solar lease in Utah history, announced March 10, 2026); Torus battery/flywheel storage installed Dec 2025; MOU with EnergySolutions for 2GW+ nuclear feasibility (2030–2035 horizon). Off-grid design.
Water. Dry cooling design described as 'essentially waterless operation'
What the source record says
Claims to be world's largest planned AI data center campus at 20M sq ft. 1,143 acres owned; 13,000-acre SITLA lease for solar (largest solar lease in Utah history — record previously stated 30,000 acres, corrected to 13,000 acres per March 2026 BusinessWire announcement and multiple independent sources). Initial customer BluSky AI allocated up to 50MW. Adjacent to Intermountain Power Project. 10GW is full-buildout target; first 300MW gas delivery H1 2027. Coordinates at Delta city centroid; site is southeast of Delta.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-06 · source-reported proposed
Creekstone announced Delta Gigasite; committed $17B to Millard County project; Series B funding closed led by Trident Ridge
- 2025-12 · source-reported under construction
Broke ground December 2025 on Delta site; first 300MW gas-fired power delivery targeted H1 2027; permits issued
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Zeo Energy to supply 280MW for Creekstone's 10GW Delta Gigasite · Data Center Dynamics
- Creekstone Energy Commits $17B to Millard County — Utah Governor's Office · Utah Governor's Office of Economic Development
- Creekstone Energy Secures 13,000-Acre SITLA Solar Lease (Largest in Utah History) · BusinessWire
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- 1-GW solar project planned for Utah hyperscale data center · Solar Power World
- Delta Gigasite could be world's largest data center · The Salt Lake Tribune
- Utah's massive data centers seek to build new power sources · Lehi Free Press
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID creekstone-delta-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000343
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Delta, UT · Millard (Approximate location)
Roles
- Operator: Creekstone Energy
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: December 2025
Provider-reported announcement date.
- Status history: 2025-06 · source-reported proposed
Status history supplied by the source.
- Status history: 2025-12 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 1,143 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 10,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: PacifiCorp
Utility as named by the provider.
- Power source: Mixed
Provider label.
- On-site generation: 300 MW (source-reported)
On-site figures often describe backup generators rather than primary supply; read the provider energy note.
Cooling, water, PUE and WUE
- Cooling: Air
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $17 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 106 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Incentive reported by the source: Rural Economic Development Tax Increment Financing (REDTIF) — 50% post-performance tax credit · Utah Governor's Office of Economic Opportunity · 2025
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-13
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.