Licensed lead · not independently verified · dcd-dir-000250

CleanArc VA1

source-reported under construction

CleanArc Data Centers

Ruther Glen · Caroline County · Virginia

Planned 900 MWSource updated 8 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for CleanArc VA1.

Exact source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
CleanArc Data Centers
Address and locality
Ruther Glen · Caroline County · Virginia
Source-reported status
under construction
Facility type
data center
Reported capacity
Planned: 900 MW (source-reported; boundary not independently verified)
Source freshness
8 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000250

What the source record says

900 MW flagship campus in Ruther Glen, Caroline County, phased into the mid-2030s (200 MW online targeted Q3 2026). Distinct operator/parcel from the AWS Mattermeade campus (also Caroline County). Coordinates are the Ruther Glen area centroid. investmentUsd records the confirmed $3B first-phase pledge (VEDP); the ~$8.8B full-buildout figure is a projection and is excluded.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11 · source-reported under construction

    CleanArc broke ground on its 900 MW flagship campus in Ruther Glen, Caroline County; 200 MW online targeted Q3 2026, phased to mid-2030s

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cleanarc-ruther-glen-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →