Licensed lead · not independently verified · dcd-dir-000250

CleanArc VA1

source-reported under construction

CleanArc Data Centers

Ruther Glen · Caroline County · Virginia

Reported planned 900 MWSource updated 8 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for CleanArc VA1.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
CleanArc Data Centers
Address and locality
Ruther Glen · Caroline County · Virginia
Official metro area
Outside an official metropolitan boundary
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 900 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
8 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000250

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Dominion Energy VirginiaUtility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Announced investment
$3 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
November 2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Caroline County EDA annual grant - 25% of incremental tax revenue for 15 years (40% for 10 years if the first data hall is operational by Sept 30 2027), capped at 10% of taxable investment · Caroline County, VA · 2025 Open cited source →
  • Virginia Data Center Retail Sales & Use Tax exemption (eligibility per VEDP; no certified award value) · Commonwealth of Virginia · 2025 Open cited source →

Provider notes

Energy. Dominion Energy Virginia is the sole investor-owned utility serving Caroline County (attribution via SCC territory; not named directly in CleanArc materials). 900 MW phased in three 300 MW stages (2027 / 2030 / 2033-2035); the VA SCC approved a large-load rate class in Nov 2025. CleanArc markets a 'True Additionality' clean-energy model; no confirmed on-site generation.

Water. The Caroline County performance agreement prohibits potable water for industrial cooling (county water for washing/flushing only); closed-loop recirculation with initial water brought off-site. Not yet operational - no daily-use figure.

Community. The Caroline County Board of Supervisors approved the performance agreement 5-1 (Aug 12 2025; lone dissent from Vice-Chair Jeff Sili). Governor Youngkin attended the Nov 20 2025 groundbreaking. No organized community opposition or litigation was found.

What the source record says

900 MW flagship campus in Ruther Glen, Caroline County, phased into the mid-2030s (200 MW online targeted Q3 2026). Distinct operator/parcel from the AWS Mattermeade campus (also Caroline County). Coordinates are the Ruther Glen area centroid. investmentUsd records the confirmed $3B first-phase pledge (VEDP); the ~$8.8B full-buildout figure is a projection and is excluded.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11 · source-reported under construction

    CleanArc broke ground on its 900 MW flagship campus in Ruther Glen, Caroline County; 200 MW online targeted Q3 2026, phased to mid-2030s

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cleanarc-ruther-glen-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000250

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Ruther Glen, VA · Caroline (Approximate location)

Roles

  • Operator: CleanArc Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: November 2025

    Provider-reported announcement date.

  • Status history: 2025-11 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 900 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Dominion Energy Virginia

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $3 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Caroline County EDA annual grant - 25% of incremental tax revenue for 15 years (40% for 10 years if the first data hall is operational by Sept 30 2027), capped at 10% of taxable investment · Caroline County, VA · 2025

    Whether the incentive was approved, awarded or received is not established.

  • Incentive reported by the source: Virginia Data Center Retail Sales & Use Tax exemption (eligibility per VEDP; no certified award value) · Commonwealth of Virginia · 2025

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-08

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →