Reported geography
Source-reported location for Red Butte Energy and Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- BrightNight
- Address and locality
- Newcastle · Iron County · Utah
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 1 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000209
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- Mixed
- Cooling
- Closed-loop
- Land area
- 2,600 acres (source-reported; parcel boundary not established)
- Announced jobs
- 500 permanent
Provider notes
Energy. Planned hybrid power: 300MW solar, 1,200MWh battery storage, and 1.5GW natural gas generation.
Water. "expected to rely primarily on air-cooled and closed-loop cooling systems designed to reduce water consumption." Recorded as closed_loop per the methodology tie-breaker: air-cooled chillers over a recirculating circuit are closed_loop; `air` is reserved for designs with no cooling water circuit at all.
What the source record says
Approximately 8 miles north of Newcastle, roughly 20 miles from Cedar City; application on hold pending the county's data-center moratorium. Subsidies checked (2026-09-08): structural zero — the project is proposed and on hold under Iron County's moratorium, and no Iron County or Newcastle CRA/RDA was found to execute a pre-approval participation agreement; Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-05-22 · source-reported proposed
Application submitted May 4, 2026 and deemed incomplete May 22, 2026; on hold under Iron County's 180-day data center moratorium.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Red Butte Energy and Data Center Campus · BrightNight
- Proposed Data Center Information — Iron County · Iron County, Utah
- AI campus proposed in Iron County could bring 500 jobs, on-site power generation · St. George News
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID brightnight-red-butte-newcastle-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000209
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Newcastle, UT · Iron (Approximate location)
Roles
- Operator: BrightNight
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026-05-22 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 2,600 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: Mixed
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced jobs: 500 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-01
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.